Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD09-00273
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 10159 W OVERLAND RD
Project NameThree Rivers Agency
Customer Number 
ePlanReviewNo
Description
(Three Rivers Agency Office building) For the construction of a new office building and related site work on an existing lot with additional work to include the build out of the tenant space to include multiple offices, break room and two accessible restrooms.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/200910/15/200910/15/2009PPASS
DetailsMike Jordan
dave Phone #: ###-####. ok for perm occ.
BLD-Final10/13/200910/13/200910/13/2009PNR
DetailsMike Jordan
Dave Phone #: ###-####. Needs zoning final.
FIRE-Final Inspection10/12/200910/12/200910/12/2009PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/9/200910/12/200910/12/2009AFAIL
DetailsTroy Cobbley
provide indicator at the main exit
BLD-Framing/Rough-in8/7/20098/7/20098/7/2009PPASS
DetailsJim Sly
Dave Phone #: ###-####
F & E pass
BLD-Framing/Rough-in7/30/20097/30/20097/30/2009PFAIL
DetailsMike Jordan
Dave B Phone #: ###-####. Provide simpson A35 at top and bottom plates at 6x6 wall kicker,both sides. Install correct length 3/4 inch thru bolts at north awening into kicker. Provide LSTA15 simpson straps at all blocking. c/n posted. ok to insul.
BLD-Framing/Rough-in6/29/20096/29/20096/29/2009PPART
DetailsMike Jordan
Shear nail inspection please-Dave Phone #: ###-####. Exterior shear nailing ok.
BLD-Foundation5/29/20096/1/20096/1/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/29/2009 at 5:22:18 PM. Contact: ###-####.
BLD-Footing5/28/20095/29/20095/29/2009APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/28/2009 at 1:27:32 PM. Contact: ###-####.