BLD-Final | 2/19/2010 | 2/22/2010 | 2/26/2010 | P | DONE |
Jim Storey
|
|
|
pat Phone #: ###-####
|
BLD-Final | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-#### final ok signed card on site.
|
FIRE-Final Inspection | 2/18/2010 | 2/19/2010 | 2/19/2010 | A | PASS |
Forrest France
|
|
|
Correction notice items are finished, final fire life safety inspection passed.
|
FIRE-Conference | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | DONE |
Forrest France
|
|
|
Regarding exit discharge lighting levels at the east side of the building.
|
FIRE-Final Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | A | NR |
Forrest France
|
|
|
Pending completion of correction notice items as discussed.
|
FIRE-Final Inspection | 2/11/2010 | 2/12/2010 | 2/12/2010 | A | FAIL |
Forrest France
|
|
|
Missing one EM light at the east exit discharge per plans, EM light at the south exit disharge is not functional, stairway lacks min. foot candle lighting per IFC requirements. Remainder of fire life safety issues and C/N items are satisfactory.
|
FIRE-Conference | 2/9/2010 | 2/9/2010 | 2/9/2010 | A | DONE |
Forrest France
|
|
|
Completed on site review of city set plans and notes with contractor. Noted incorrect door hardware at the main entry/exit, five restrooms and the changing room. Missing one PFE at the second level, need to post fire access lane marking per sheet C1.1, post signage at the door to the FACP room, discussed exit signs, trade permit finals and two project related BLD permits.
|
BLD-Other | 12/17/2009 | 12/17/2009 | 12/17/2009 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####ceilling c/n made ok.
|
BLD-Framing/Rough-in | 12/16/2009 | 12/16/2009 | 12/16/2009 | P | FAIL |
Jim Storey
|
|
|
ceililng grid cover up inspection please--late this afternoon please-Pat Phone #: ###-#### support hvac/can lights and audio in ceilling.
|
BLD-Wall cover | 11/13/2009 | 11/13/2009 | 11/13/2009 | P | PASS |
Jim Storey
|
|
|
PAT Phone #: ###-#### hard lids ok
|
BLD-Framing/Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Jim Storey
|
|
|
pat Phone #: ###-####
|
BLD-Framing/Rough-in | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PASS |
Jim Storey
|
|
|
pat Phone #: ###-####
|
BLD-Wall cover | 10/15/2009 | 10/16/2009 | 10/16/2009 | A | PART |
Jim Storey
|
|
|
pat Phone #: ###-#### roof and wall framing ok south side of the building ok to insulate.
|
BLD-Concrete | 10/13/2009 | 10/13/2009 | 10/13/2009 | P | PASS |
Jim Storey
|
|
|
trash encloser ft and pad rebar ok
|
BLD-Other | 10/5/2009 | 10/6/2009 | 10/6/2009 | A | PASS |
Jim Storey
|
|
|
Pat-grout underneath the columns Phone #: ###-#### grout ok for cover at interior colm.s
|
BLD-Other | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Jim Storey
|
|
|
roof ok to cover.
|
BLD-Other | 9/10/2009 | 9/11/2009 | 9/10/2009 | P | FAIL |
Jim Storey
|
|
|
pat - roof sheating Phone #: ###-####
|
BLD-Other | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Jim Storey
|
|
|
Pat- sheer wall Phone #: ###-####
|
BLD-Framing/Rough-in | 8/3/2009 | 8/4/2009 | 8/4/2009 | A | PART |
Jim Storey
|
|
|
PAT Phone #: ###-#### plate and anchor bolts in place to sill plate.
|
BLD-Foundation | 7/21/2009 | 7/22/2009 | 7/22/2009 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 7/15/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Jim Storey
|
|
|
pat Phone #: ###-####
|
BLD-Foundation | 7/7/2009 | 7/8/2009 | 7/8/2009 | P | PASS |
Jim Storey
|
|
|
pat - wall Phone #: ###-#### si to test concrete rebar ok and anchor bolts spacing ok
|
FIRE-Conference | 7/1/2009 | 7/1/2009 | 7/1/2009 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the contractor about fire hydrant placement.
|
BLD-Footing | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####.. Perimeter footings only. Noted that Job has a special insp. agency on site as per approvedplans and start up sheet.
|