BLD-Final | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Tony Young
|
|
|
dan Phone #: ###-#### phase one ok
|
DOC - Permit Finaled | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | PASS |
Tony Young
|
|
|
phase one ok,, recvd engineers reports for final
|
BLD-Framing/Rough-in | 10/8/2009 | 10/9/2009 | 10/12/2009 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/8/2009 at 4:07:32 PM. Contact: ###-####.looked at steel beams and post also steel studs walked project with super all look wright per plan also note that engineer has been on site several times.also.
|
BLD-Conference | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/30/2009 at 7:44:24 AM. Contact: ###-####. Walked thru with Dan CM Co. .......Talked about Phased inspections.
|
BLD-Footing | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/27/2009 at 7:53:54 AM. Contact: ###-####. 2 north pad ftgs,, pending S. I. report
|
BLD-Footing | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PART |
Dave Hannah
|
|
|
Dan Phone #: ###-#### ok spec inspection inspected rebar and concrete
|