Permit Information
Permit NumberBLD09-00398
StatusFinaled
Name CM COMPANY
Site Address 1406 W EASTMAN ST
Project NameTrICA PHASE 1
Customer Number 
ePlanReviewNo
Description
(TrICA PHASE 1 STRUCTURAL IMPROVEMENTS) To perform select interior demolition at basement, first and second floors and exterior areas of wall and roof to allow the installation of new structural concrete footings, steel columns and beams to provide structural upgrades to support vertical loads at floors and roof of east half of building. Structural modification of the west portion of the building and all structural modifications to address lateral loads for the entire building will be submitted under future Phase II plans and application for separate permit. Once building is stabilized, additional interior non-structural demolition will occur in preparation for future tenant improvments which will be under separate permit. To reinforce existing exterior wall wood studs with steel studs on each side per structural engineering design. Special Inspection required per attached Project Start Up for Special Inspection for and Sheet s1.0 of plans. NO OCCUPANCY OR USE IS ALLOWED WITHIN THE SCOPE OF THIS PERMIT. See attached MEMORANDUM setting limits for Planning & Zoning, signed by Hal Simmons, dated 18 March 2009. NOTE: The issuance of this permit does not guarantee the approval or issuance of future permits when plans & applications for upgrades, occupancy or use for this building are submitted. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/22/200910/23/200910/23/2009APASS
DetailsTony Young
dan Phone #: ###-####
phase one ok
DOC - Permit Finaled10/23/200910/23/200910/23/2009PPASS
DetailsTony Young
phase one ok,, recvd engineers reports for final
BLD-Framing/Rough-in10/8/200910/9/200910/12/2009PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/8/2009 at 4:07:32 PM. Contact: ###-####.looked at steel beams and post also steel studs walked project with super all look wright per plan also note that engineer has been on site several times.also.
BLD-Conference9/30/20099/30/20099/30/2009PDONE
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/30/2009 at 7:44:24 AM. Contact: ###-####.
Walked thru with Dan CM Co. .......Talked about Phased inspections.
BLD-Footing7/27/20097/27/20097/27/2009PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/27/2009 at 7:53:54 AM. Contact: ###-####.
2 north pad ftgs,, pending S. I. report
BLD-Footing7/23/20097/24/20097/24/2009APART
DetailsDave Hannah
Dan Phone #: ###-#### ok spec inspection inspected rebar and concrete