FIRE-Conference | 7/17/2009 | 7/17/2009 | 7/17/2009 | P | DONE |
Troy Cobbley
|
|
|
I went over the gas cabinet requirements with Greg. He is limited to 504 cubic feet as per fire review note #12.
|
BLD-Final | 7/16/2009 | 7/17/2009 | 7/17/2009 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/15/2009 | 7/16/2009 | 7/16/2009 | P | NR |
Jim Sly
|
|
|
greg Phone #: ###-#### Need Zoning final
|
FIRE-Final Inspection | 7/15/2009 | 7/16/2009 | 7/16/2009 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
FIRE-Final Inspection | 7/13/2009 | 7/14/2009 | 7/15/2009 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the project related fire alarm and fire sprinkler drawings have been modified to exclude sutie 325
|
BLD-Framing/Rough-in | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Tom Arcoraci
|
|
|
Ceiling grid for cover-Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PART |
Mike Jordan
|
|
|
INterior frmaed walls only. No grid.Pend. plumbing ri insp.
|
BLD-Framing/Rough-in | 5/29/2009 | 6/1/2009 | 6/1/2009 | A | NR |
Mike Jordan
|
|
|
Greg-3rd floor Phone #: ###-####. Rescheduled for pm. Still needs plumbing ri insp.
|
BLD-Framing/Rough-in | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | NR |
Mike Jordan
|
|
|
Greg ###-####. Needs plumbing ri first.
|
BLD-Conference | 5/14/2009 | 5/15/2009 | 5/15/2009 | A | DONE |
Mike Jordan
|
|
|
Greg Phone #: ###-####. Noted that contractor has resubmitted plans for additional work.
|
FIRE-Conference | 5/13/2009 | 5/14/2009 | 5/14/2009 | A | DONE |
Troy Cobbley
|
|
|
I contacted Layton construction about the attached FIR permit. Per the BLD permit all of the work is on the third floor. The attached FIR is for work on the second floor that they are not a part of.
|