BLD-Final | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Aging Inspection | 7/6/2010 | 7/6/2010 | 7/8/2010 | | PASS |
Jim Storey
|
|
|
temp ok
|
BLD-Final | 5/6/2010 | 5/6/2010 | 5/6/2010 | A | PASS |
Jim Storey
|
|
|
temp ok
|
BLD-Final | 5/5/2010 | 5/5/2010 | 5/6/2010 | P | DEFR |
Jim Storey
|
|
|
james Phone #: ###-#### out of time
|
FIRE-Final Inspection | 5/3/2010 | 5/4/2010 | 5/4/2010 | A | PASS |
Forrest France
|
|
|
Corrections finished, life safety final approved for the scope of this permit.
|
FIRE-Final Inspection | 4/9/2010 | 4/13/2010 | 4/13/2010 | A | FAIL |
Forrest France
|
|
|
Missing one EM light per plan sheet E2.1, door hardware at two locations is not yet installed due to paint finishes underway, building address numbers are not posted. Note, the PFE is due annual certification this month.
|
FIRE-Conference | 4/12/2010 | 4/12/2010 | 4/12/2010 | A | DONE |
Forrest France
|
|
|
Regarding final inspection.
|
BLD-Energy code compliance | 2/17/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-####
|
BLD-Aging Inspection | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | DONE |
Forrest France
|
|
|
Work in progress
|
BLD-Framing/Rough-in | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Jim Storey
|
|
|
Shear inspection please-James Phone #: ###-#### nail insp ok to cover w/gyp. as per plan
|
BLD-Foundation | 10/27/2009 | 10/27/2009 | 10/27/2009 | P | PASS |
Mike Jordan
|
|
|
chris Phone #: ###-####. Column pad footings for bldg. #2. ok.
|
BLD-Foundation | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Jim Storey
|
|
|
chris - wall - steel Phone #: ###-#### ok pending ab and pad ft.
|
BLD-Footing | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
BLD-Aging Inspection | 10/6/2009 | 10/6/2009 | 10/6/2009 | | PASS |
Jim Storey
|
|
|
wip
|