Permit Information
Permit NumberBLD09-00614
StatusFinaled
Name HILL CONSTRUCTION CO
Site Address 7311 W POTOMAC DR
Project NameBOISE POLICE ASSOCIATION
Customer Number 
ePlanReviewNo
Description
(BOISE POLICE ASSOCIATION - CLUBHOUSE AND EVENT CENTER) A fire sprinkler system is required to be installed throughout this building. To convert an existing 13,087 square foot office building (12,437 square feet inside and 650 square feet outside) to an event center. The basement has a total floor area of about 6,227 square feet and the 1st story has a total floor area of about 6,860 square feet (6,210 square feet inside and 650 square feet outside). The work is to include 4 restrooms accessible to the disabled, an interior bearing wall in the basement with a new concrete footing, altered open web floor trusses to shorten their span, two glu-lam roof beams, a tube steel column, and interior finishes. Special inspection is required for welding and for the modifications to the open web floor trusses. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. In conjunction with this permit, this building is required to be fully fire sprinklered per NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/24/200911/24/200911/24/2009PPASS
DetailsTom Arcoraci
request late pm, please call 45-30 min prior///Troy Blanton Phone #: ###-####
BLD-Final10/27/200910/28/200910/28/2009ANR
DetailsTom Arcoraci
Troy Blanton ###-#### needs handrails completed
FIRE-Final Inspection10/26/200910/27/200910/27/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Other9/30/200910/1/200910/1/2009APASS
DetailsTom Arcoraci
Troy Phone #: ###-#### grid maintained as built
BLD-Framing/Rough-in8/28/20098/31/20098/31/2009APART
DetailsJim Storey
TROY Phone #: ###-#### 450 c/n still pending papper work to recieve at next insp. header ok. sheer wall with staples ok if papper work is 8 and 8 oc/ lvl just fied on plan note as opsunal.
BLD-Framing/Rough-in8/25/20098/26/20098/26/2009PPART
DetailsMike Jordan
Troy Phone #: ###-####. Interior wood framed walls. Need RFI from engineer for shearwall attachment in basement. Noted descrepency on plans and fasterners to be used not listed. Also needs detailfrom engineer justifing use os wood framed wall in leiu of LVL as shown on approved plans.
BLD-Footing7/30/20097/31/20097/31/2009PPASS
DetailsJim Storey
troy Phone #: ###-#### - early afternoon please center bearing ft ok need si for 3000psi concrete pending.