Permit Number | BLD09-00808 |
Status | Expired |
Name |
H & K MECHANICAL INC
|
Site Address |
11101 W EXECUTIVE DR
|
Project Name | Clean Energy |
Customer Number | |
ePlanReview | No |
Description |
(CLEAN ENERGY) To add a new compressed natural gas (CNG) fueling system at the existing Allied Waste facility. This new (CNG) system will be designed as an unattended private (CNG) fueling facility and is intended to serve the refueling needs for (CNG) powered vehicles. Work to include: Installation of a new electrically driven (CNG) compressor system, a low pressure gas dryer, a (CNG) storage vessel, twenty four time fill fueling stalls, the associated controls, equipment pads, interconnecting piping, electrical and safety system, construction and installation of dedicated electrical and gas services to serve the proposed (CNG) system, and a 6ft tall chain link fence. Reinforced concrete equipment pads and anchorage systems per engineering. All work per the approved plans and all other reviewing agencies approvals. **SRZ**
|