Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-00860
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES HISTOLOGY
Customer Number 
ePlanReviewNo
Description
(ST. LUKE'S - HISTOLOGY & HEMATOLOGY)(1ST FLR) To remodel portions of the existing Histology Lab and Hematology Lab, a total of 2,470 sq. ft. area on the north side of the first floor in existing hospital building per approved plans. Work to include select interior demolition, construction of a reinforced masonry wall to add to lateral integrity of the hospital; modify room layouts, access/egress doors and hardware and use areas for testing, support staff offices and work areas. Special Inspection required for masonry construction and epoxy/adhesive anchor installations (ESR-2262, Hilti HIT-HY 150 MAX, for use with uncracked concrete) . NOTE: This building is fully fire sprinklered based on occupancy use group "I". drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/5/20114/5/20114/5/2011APASS
DetailsForrest France
Final okay. Inspection passed- Ref. activity notes.
BLD-Aging Inspection2/14/20112/14/20112/14/2011 PASS
DetailsDave Hannah
BLD-Final12/15/201012/15/201012/15/2010PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Final12/13/201012/13/201012/14/2010PNR
DetailsDave Hannah
kelly Phone #: ###-####
FIRE-Final Inspection12/13/201012/13/201012/13/2010APASS
DetailsForrest France
Correction items finished. Fire life safety finaled.
FIRE-Final Inspection12/7/201012/8/201012/8/2010APART
DetailsForrest France
Final pending door hardware at two locations.
BLD-Framing/Rough-in10/20/201010/21/201010/21/2010APART
DetailsDave Hannah
Kelly Phone #: ###-#### ok to cover 2hr wall
BLD-Framing/Rough-in10/19/201010/20/201010/20/2010ANR
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Conference8/25/20108/25/20109/1/2010APASS
DetailsDave Hannah
work in progress
BLD-Aging Inspection8/25/20108/25/20108/25/2010 PASS
DetailsDave Hannah
BLD-Framing/Rough-in4/28/20104/29/20104/29/2010APART
DetailsDave Hannah
zack - cover insp Phone #: ###-#### ok to cover ceiling in pn 3
BLD-Framing/Rough-in4/6/20104/7/20104/7/2010APASS
DetailsDave Hannah
zack Phone #: ###-#### ok to cover ph3 after all other trades ok for cover
BLD-Aging Inspection10/1/200910/1/200910/6/2009 PART
DetailsDave Hannah
wip