BLD-Final | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 7/30/2010 | 8/2/2010 | 8/10/2010 | A | PART |
Tony Young
|
|
|
Jim Phone #: ###-####,, need final architect reports... etc. need exterior stair issues resolved
|
BLD-Final | 7/29/2010 | 7/30/2010 | 7/30/2010 | P | PART |
Tony Young
|
|
|
Jim Phone #: ###-####,, temp ok pending others
|
FIRE-Final Inspection | 7/23/2010 | 7/26/2010 | 7/26/2010 | P | PASS |
Forrest France
|
|
|
Corrections field verified for completion. Fire life safety passed.
|
FIRE-Final Inspection | 7/22/2010 | 7/23/2010 | 7/23/2010 | A | FAIL |
Forrest France
|
|
|
Missing one EM light at the counselors room 1st floor per plan, install one exit sign with directional arrow per plan at the 1st floor north corridor, add one EM light at the basement level band room, provide one missing PFE at the 2nd floor, post max occupant signs at the cafeteria and gym as discussed. Remainder of fire life safety items okayed.
|
FIRE-Conference | 7/20/2010 | 7/20/2010 | 7/20/2010 | A | DONE |
Forrest France
|
|
|
Discussion with contractor regarding project completion and trade permit work.
|
BLD-Other | 6/7/2010 | 6/8/2010 | 6/8/2010 | P | PASS |
Tony Young
|
|
|
jim - overhead ceiling tile cover Phone #: ###-####,, basment ok
|
BLD-Conference | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PART |
Tony Young
|
|
|
Jim Stubbs Phone #: ###-#### stair ?s,, ceilings ok pending others
|
BLD-Other | 5/24/2010 | 5/25/2010 | 5/26/2010 | P | PASS |
Tony Young
|
|
|
ceiling cover Phone #: ###-####,, main halls ok
|
BLD-Framing/Rough-in | 5/24/2010 | 5/24/2010 | 5/24/2010 | P | PART |
Tony Young
|
|
|
ceiling cover Phone #: ###-####,, main hallway needs more firecaulking,, tie all wires,, conf on basement ceiling
|
BLD-Framing/Rough-in | 4/26/2010 | 4/26/2010 | 4/27/2010 | P | CANC |
Tony Young
|
|
|
rob Phone #: ###-####
|
BLD-Framing/Rough-in | 4/27/2010 | 4/27/2010 | 4/27/2010 | A | PART |
Tony Young
|
|
|
rob Phone #: ###-####,, grid work in progress,, also conf on north/ east landing and stair,, need to rebuild to meet code
|
BLD-Other | 4/26/2010 | 4/27/2010 | 4/27/2010 | A | PART |
Tony Young
|
|
|
rob Phone #: ###-####,, ceiling grid,, north of main level grid ok,, upper level ok
|
FIRE-Conference | 2/24/2010 | 2/24/2010 | 2/26/2010 | P | DONE |
Forrest France
|
|
|
On site meeting with project architect regarding IFC sec. 906 and IDAPA amendments.
|
FIRE-Final Inspection | 2/24/2010 | 2/24/2010 | 2/24/2010 | P | CANC |
Forrest France
|
|
|
Incorrect inspection type, not intended for final.
|
BLD-Framing/Rough-in | 2/16/2010 | 2/17/2010 | 2/17/2010 | P | PART |
Tony Young
|
|
|
Ceiling cover inspection please-Rob Phone #: ###-#### north stairs ok x 2
|
BLD-Other | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | PART |
Tony Young
|
|
|
Rob this is foe the fire lid in elevator shaft Phone #: ###-####elevator room and elevator lid 1st layers ok
|
BLD-Framing/Rough-in | 1/20/2010 | 1/20/2010 | 1/20/2010 | P | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### main level main lav ceiling ok
|
FIRE-Conference | 1/15/2010 | 1/15/2010 | 1/15/2010 | A | DONE |
Forrest France
|
|
|
Conference with general contractor regarding NFPA 13 2007 sec. 8.15.1.2.-8.15.2.2.
|
BLD-Framing/Rough-in | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PART |
Jim Sly
|
|
|
rob Phone #: ###-#### OK to cover chase walls located between main restrooms....1st floor....and lids at 3 small restrooms at South end bldg (Kindergarten area).
|
BLD-Framing/Rough-in | 1/7/2010 | 1/7/2010 | 1/7/2010 | P | PART |
Tom Arcoraci
|
|
|
Rob Phone #: ###-#### two hard lids south side,studs in hall for new support, non bearing walls 2 west side 1 east ok
|
BLD-Framing/Rough-in | 12/23/2009 | 12/23/2009 | 12/24/2009 | P | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### hard lids in rest rooms
|
BLD-Framing/Rough-in | 12/11/2009 | 12/14/2009 | 12/14/2009 | A | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### interior walls as noted on plans
|
BLD-Framing/Rough-in | 12/3/2009 | 12/4/2009 | 12/4/2009 | A | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### upper floor hall way bearing walls,, pending trades ok to insulate and cover
|
BLD-Framing/Rough-in | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | DEFR |
Tony Young
|
|
|
Rob Phone #: ###-#### out of time, told him he could insulate,, re scheduled for 12/4
|
BLD-Framing/Rough-in | 11/12/2009 | 11/16/2009 | 11/16/2009 | A | PART |
Tony Young
|
|
|
rob Phone #: ###-#### some interior walls,, ok pending trades r/in,,, siesmic ties in roof on So. end,, other ties ok pend engineer letter of ok
|
BLD-Framing/Rough-in | 10/27/2009 | 10/28/2009 | 10/28/2009 | A | PART |
Tony Young
|
|
|
Rob Phone #: ###-#### 2nd floor floor ties ok on north wing pending special inspection report,, also 2 ties at entry
|
BLD-Framing/Rough-in | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | NR |
Tony Young
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2009 | 9/21/2009 | 9/21/2009 | A | PART |
Tom Arcoraci
|
|
|
Rob Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PART |
Jim Storey
|
|
|
rob Phone #: ###-#### roof straping and nailling ok marked plan as to location.
|
BLD-Framing/Rough-in | 9/4/2009 | 9/8/2009 | 9/8/2009 | P | PART |
Tony Young
|
|
|
rob Phone #: ###-#### seismic ties roof area 1 and 5
|
FIRE-Conference | 2/16/2010 | 2/16/2010 | | P | |
Forrest France
|
|
|
Don H. Phone #: ###-####
|