Permit Information
Permit NumberBLD09-00945
StatusFinaled
Name HC COMPANY INC
Site Address 7808 W FAIRVIEW AVE
Project NameDEPT OF HEALTH & WELFARE
Customer Number 
ePlanReviewNo
Description
(IDAHO DEPARTMENT OF HEALTH AND WELFARE) (INTERIOR REMODEL) (SOUTH BUILDING) (5-3-10 PLAN MODIFICATION TO CUT BACK THE SCOPE OF WORK FURTHER FOR ADDITIONAL COST SAVINGS. THE OCCUPANT LOAD FOR STAFF TRAINING ROOM 131 WAS REDUCED FROM 170 TO 105 BECAUSE THE ROOM WAS MADE SMALLER.) (3-25-2010 PLAN MODIFICATION TO EXPAND STAFF TRAINING ROOMS 237 AND 239, KEEP WOMEN'S RESTROOM 209 AS TWO SEPARATE RESTROOMS, KEEP MEN'S RESTROOM 210 AS TWO SEPARATE RESTROOMS, AND TO COMBINE SR FILE ROOM 227 WITH STATE MAIL 226. FOR COST SAVINGS, THIS PROJECT WAS RE-DESIGNED TO INCORPORATE SOME EXISTING CONSTRUCTION THAT WAS FORMERLY GOING TO BE DEMOLISHED. ELEMENTS OF SOME EXISTING TUNNELED CORRIDORS WILL BE MAINTAINED EVEN THOUGH THE CORRIDORS WILL NO LONGER BE ENCLOSED. HEADERS AT NEW WALL OPENINGS ARE REQUIRED TO BE SUFFICIENT TO SUPPORT THE LOADS.) Fire sprinklers used for building area increase and for code trade-offs. To remodel the interior of an existing 73,639 square foot building for the current tenant. Several existing restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, finishes, and an exterior ramp. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire sprinkler system is required to be upgraded to comply with current standards, including quick-response sprinklers, in order to avoid enclosed 1-hr fire-resistance-rated corridors. Elements of the existing fire sprinkler system that already comply with current standards may remain without upgrade. This building remodel will be done in phases. Occupancy of a completed phase shall be coordinated with the Structural Inspector and Fire Inspector. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20109/8/20109/8/2010PPASS
DetailsJim Sly
Please call 1/2 hour prior, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett
OK for Perm Occ.
FIRE-Final Inspection9/8/20109/8/20109/8/2010PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final9/7/20109/8/20109/8/2010ACANC
DetailsJim Sly
Please call 1/2 hour prior, thanks. Phone #: ###-#### >> Inspection requested via web by Darren Gossett Inspection cancelled from web by: Darren Gossett
BLD-Final9/1/20109/7/20109/7/2010ACANC
DetailsJim Sly
Darren Phone #: ###-#### Inspection cancelled from web by: Darren Gossett
FIRE-Final Inspection9/1/20109/3/20109/3/2010ACANC
DetailsTroy Cobbley
Need the project related fire alarm permit signed off.
FIRE-Final Inspection7/29/20107/30/20107/30/2010AFAIL
DetailsTroy Cobbley
Todays inspection was for phase 13. Life safety passed in this area.
BLD-Framing/Rough-in7/21/20107/21/20107/21/2010PPASS
DetailsMike Jordan
Darren Phone #: ###-####. Wod columns and beams for accordian doora, phase 13.
BLD-Framing/Rough-in7/12/20107/12/20107/12/2010PPASS
DetailsJim Sly
Darren Phone #: ###-####
Wall cover phase 13........OK.
BLD-Framing/Rough-in7/6/20107/7/20107/7/2010APART
DetailsJim Sly
Darrin phone ###-####
Phase 11 OK
FIRE-Final Inspection7/6/20107/6/20107/7/2010PPART
DetailsTroy Cobbley
The existing fire alarm devices tested ok in Phase 11.
BLD-Final7/6/20107/6/20107/6/2010PCANC
DetailsJim Sly
darren Phone #: ###-####
Re-sched......
FIRE-Final Inspection7/1/20107/2/20107/2/2010APART
DetailsTroy Cobbley
The phase 11 life safety passed.
BLD-Framing/Rough-in6/30/20107/1/20107/1/2010APASS
DetailsJim Sly
darrin - ceiling/conference Phone #: ###-####
OK'd ceiling and minor Change of plan for addition of 1 door and moving another door to a new location approx 6' away. Conference rooms, Phase 13.
BLD-Framing/Rough-in6/21/20106/21/20106/21/2010PPASS
DetailsJim Sly
Darren Phone #: ###-####
Select walls OK
BLD-Final6/11/20106/14/20106/14/2010APART
DetailsJim Sly
Chris-please call at least 30 mins prior to inspection for access Phone #: ###-####
Phase 10......OK for Temp Occ.
BLD-Final6/10/20106/11/20106/11/2010PCANC
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
FIRE-Final Inspection6/10/20106/11/20106/11/2010APART
DetailsTroy Cobbley
Phase 10 life safety passed.
BLD-Framing/Rough-in5/27/20105/27/20105/27/2010PPART
DetailsJim Sly
Darren Phone #: ###-####
Phase 10 OK
BLD-Other5/25/20105/26/20105/26/2010APASS
DetailsJim Sly
Darren Phone #: ###-####
OK for Temp Occ.....Phase 9.
FIRE-Final Inspection5/18/20105/19/20105/19/2010APART
DetailsTroy Cobbley
Phase 9 life safety passed. The two exit signs have been installed.
FIRE-Final Inspection5/18/20105/18/20105/18/2010PFAIL
DetailsTroy Cobbley
Todays inspection was for phase 9. Two exit signs need to be added as discussed. The missing exit sign in the short corridor at restroom 118 can remain missing. This work will be completed by morning per Darren. A follow up inspection has been scheduled.
BLD-Framing/Rough-in5/4/20105/4/20105/4/2010PPART
DetailsJim Sly
darren Phone #: ###-####
Phase 9 OK
FIRE-Conference4/21/20104/21/20104/21/2010PDONE
DetailsTroy Cobbley
Darren and I spoke about the requirements for the backflow preventor to be electrically supervised as per IFC 903.4.
BLD-Final3/26/20103/29/20103/29/2010PCANC
DetailsJim Sly
chauntel hyde Phone #: ###-####
FIRE-Final Inspection3/26/20103/29/20103/29/2010ACANC
DetailsTroy Cobbley
chauntel hyde Phone #: ###-#### Wrong permit number and project set up for inspection.
BLD-Final3/26/20103/29/20103/29/2010APART
DetailsJim Sly
Darren Phone #: ###-####
Phase 8 OK for Temp.
BLD-Final3/26/20103/26/20103/26/2010PPART
DetailsJim Sly
Darren Phone #: ###-####
Select area OK for Temp Occ.
FIRE-Final Inspection3/26/20103/26/20103/26/2010PPART
DetailsTroy Cobbley
Phase 8 life safety passed. The floor plans have been resubmitted and approved for plan modifications as requested. I discussed with Darren that the additional exit signs as marked by the plan reviewer in the phase 9 and 10 area corridors will be required prior to final.
FIRE-Final Inspection3/23/20103/24/20103/24/2010AFAIL
DetailsTroy Cobbley
Todays inspection was for life safety in phase 8. All of the exit signs and emergency lights functioned correctly, door hardware appeared adequate and fire extinguishers had been installed. The problem is there are substantial floor plan changes that do not match the city approved plans. I spoke to Jim Sly, Carl Westfall and Scott Arellano and it is agreed that resubmittals/plan modifications and the related inspection are required prior to occupancy of phase 8.
BLD-Other3/22/20103/22/20103/22/2010PPASS
DetailsJim Sly
Please call 1/2 hour prior upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-####
Ceiling grid select area.
BLD-Framing/Rough-in2/26/20103/1/20103/1/2010APART
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-####
Phase 8 OK
BLD-Final2/10/20102/10/20102/10/2010PPART
DetailsJim Sly
Darren Phone #: ###-####
Temp Occ OK Phase 6 and 7 central.
FIRE-Final Inspection1/29/20102/1/20102/1/2010APART
DetailsTroy Cobbley
The open office part of phase 6 life safety is passed and the storage area of phase 7 life safety is passed.
BLD-Framing/Rough-in1/25/20101/27/20101/27/2010APART
DetailsJim Sly
Darrin phone ###-####
Framing at North side of phase 6 .....OK
BLD-Framing/Rough-in1/25/20101/26/20101/25/2010ACANC
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
Re- sched.....
BLD-Framing/Rough-in1/18/20101/19/20101/19/2010APART
DetailsJim Sly
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
OK to cover Phase 6 Lobby..........C/N....Architect of record to resubmit to Boise City PDS Dept. all changes from approved plan as follows: Leave wall dividing rooms 209 and 210 (restrooms) in leiu of Demo, Demo wall dividing rooms 226 and 227, and leaving section of hallway walls (238) located between hallway 225 and hallway 206.... as is.
FIRE-Final Inspection1/18/20101/19/20101/19/2010APART
DetailsTroy Cobbley
The life safety inspection for the main lobby/waiting area remodel of Phase 6 is passed. HC Company will repair the exit sign over the main exit doors, provide an additional emergency light in the rear corridor and provide one additional fire extinguisher as discussed. These items will be verified when the remaining rooms in the lobby/waiting area are completed.
FIRE-Conference1/15/20101/15/20101/15/2010PDONE
DetailsTroy Cobbley
Per HC Company's request I spoke to Scott and he agreed that we would allow the remodeled/expanded main Lobby/Waiting area to be occupied Tuesday morning, 1/18/10, as long as the sprinklers, alarms (pending resubmittal) and life safety were complete. Darren with HC agreed and will be setting up an inspection for tuesday morning to verify items with Troy Cobbley.
FIRE-Conference1/11/20101/12/20101/12/2010ADONE
DetailsTroy Cobbley
I went over life safety requirements for the remodel in the existing main lobby area. I found that fire alarm modifications that were not previously shown on the project related fire alarm permit will need to be submitted to show the changes that are required due to the use change in this lobby area.
BLD-Framing/Rough-in1/11/20101/12/20101/12/2010APART
DetailsJim Sly
Darren ###-####
Select walls OK to cover ....phase 6
BLD-Framing/Rough-in1/11/20101/11/20101/11/2010PCANC
DetailsJim Sly
Please call 1/2 hour prior, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
Re-sche.......
FIRE-Final Inspection12/29/200912/30/200912/30/2009APART
DetailsTroy Cobbley
Phase 2 life safety is passed. The stand alone duct smoke detector passed inspection. The access controled egress lock has been disabled for now. I spoke to Darren about this door issue needing addressed prior to final sign off of the project.
BLD-Final12/21/200912/22/200912/22/2009APART
DetailsJim Sly
Darren Phone #: ###-#### Phase 5 OK for Temp.......
FIRE-Final Inspection12/21/200912/21/200912/21/2009PPART
DetailsForrest France
Items at "phase 5" repaired while on site include EM lights, door hardware at two locations, one exit sign. Mag lock at the north exit disabled, notified contractor hardware must comply with IFC chapter 10 if functional.
BLD-Other12/9/200912/9/200912/9/2009APART
DetailsJim Sly
Please call 1/2 hour prior to arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
OK for Temp Occ. phase 4
BLD-Framing/Rough-in12/8/200912/8/200912/8/2009APART
DetailsJim Sly
###-#### Darren
Phased Insp.
FIRE-Final Inspection12/7/200912/8/200912/8/2009AFAIL
DetailsTroy Cobbley
This inspection was for phase 2. The insulation at the roof deck needs repaired. The existing "access controled egress" lock on the door to the lobby needs to meet the requirements of chapter 10 of the IFC. An existing duct smoke detector has been removed from a hvac unit and will need to be re-installed and tested. The existing fire alarm system will need to be tested for functionality as well. The ADA compliant door hardware has not been installed on both doors for the short corridor next to the electrical room as shown to be done on the city approved plans. I spoke to Chris with HC Company about the fire alarm/duct smoke detector and the "access controled egress door" via a phone conversation.
FIRE-Final Inspection12/3/200912/3/200912/3/2009PPART
DetailsTroy Cobbley
Phase 4 fire life safety is complete.
FIRE-Final Inspection12/2/200912/3/200912/3/2009AFAIL
DetailsTroy Cobbley
This inspection was for phase 4. The project related fire alarm permit needs passed for this area and the exit sign/emergency light re-oriented as per the city approved plans.
BLD-Wall cover11/3/200911/4/200911/4/2009APART
DetailsJim Sly
Please call 1/2 upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
Framing OK phase 2 and phase 4
BLD-Final11/2/200911/2/200911/2/2009PCANC
DetailsJim Sly
Chris phone
BLD-Final11/2/200911/2/200911/2/2009PPART
DetailsJim Sly
Chris phone Phase 3 OK for Temp Occ as circled on appr plan.
FIRE-Final Inspection11/2/200911/2/200911/2/2009PPART
DetailsForrest France
Fire life safety inspection completed okay for the phase 3 portion of remodel work, some corrections made while on site including removal of covers at existing smoke detectors, directional arrow at one exit sign, escutcheons at some sprinkler heads. Remodel work at adjacent areas in progress.
BLD-Final10/30/200911/2/200911/2/2009ACANC
DetailsJim Sly
Re-sched.....
BLD-Final10/30/200911/2/200911/2/2009ACANC
DetailsJim Sly
Re-sched.....
BLD-Final10/29/200910/30/200910/30/2009PNR
DetailsJim Sly
chris Phone #: ###-####
BLD-Framing/Rough-in10/29/200910/30/200910/30/2009APART
DetailsJim Sly
chris Phone #: ###-####
Grid phase3 OK....Circled on plan.
BLD-Framing/Rough-in10/13/200910/13/200910/13/2009PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/13/2009 at 10:07:35 AM. Contact: ###-####.
Wall located between Rms 134 and 169.....Braced via perpendicular walls as per new engineering. All framing OK in phase 1.
BLD-Framing/Rough-in10/8/200910/8/200910/8/2009APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/8/2009 at 7:06:25 AM. Contact: ###-####.
OK to cover all but .........C/N on Wall located between Clerical room (134) and Child support room (169) ......Arch to provide detail for lat.brace top of wall.
FIRE-Conference10/1/200910/2/200910/2/2009ADONE
DetailsTroy Cobbley
Per conversation between Darren with HC Company, Mark Sentenno and myself areas of this project will be phased. The tenant will be able to occupy the remodeled areas as long as all fire alarm, fire sprinkler and fire life safety items are complete in the occupied remodeled areas. A final will be given when the entire project is complete.