BLD-Final | 2/17/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
curt - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 2/16/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Conference | 11/12/2010 | 11/15/2010 | 11/15/2010 | A | DONE |
Troy Cobbley
|
|
|
I left address and permit information on both Mark Sentenno's and Scott Arellano's voice mails.
|
FIRE-Conference | 11/12/2010 | 11/12/2010 | 11/12/2010 | P | DONE |
Troy Cobbley
|
|
|
Kurt; phone ###-####. Kurt and I spoke about the missing fire hydrant. I deferred him to Scott Arellano. I also afterward spoke to Mark Senteno. A conference has been set up for monday to bring scott and mark up to speed on project status.
|
FIRE-Conference | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | DONE |
Troy Cobbley
|
|
|
I met with Tom Bolens and discussed the missing fire hydrant shown on resubmittal sheet A1.0. I deferred him to Scott Arellano for requirement information.
|
FIRE-Final Inspection | 11/9/2010 | 11/9/2010 | 11/9/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide two Fire Lane - No Parking signs and post them as discussed and provide verification with plan review about possible resubmittals due to the mezzanine not being built.
|
BLD-Other | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | PASS |
Mike Jordan
|
|
|
shear inspection//Curt Phone #: ###-####. interior shear walls ok.
|
BLD-Framing/Rough-in | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | PART |
Mike Jordan
|
|
|
Curt please call 30 min before going out Phone #: ###-####. Ok to install osb roof deck and exterior metal siding. Verified holdowns and all straps.
|
BLD-Footing | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Mike Jordan
|
|
|
john - rebar Phone #: ###-####. Welded wire mesh and #4 rebar @ 4ft. on center for interior slab on grade ok. Constructed as per approved plans.
|
BLD-Footing | 4/6/2010 | 4/7/2010 | 4/7/2010 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####.. Reviewed special inspection report on epox dowels for misplaced vertical reinforcement at piers. Also reviewed clarification and reinspected reinforcement for piers. ok for concrete.
|
BLD-Foundation | 4/6/2010 | 4/6/2010 | 4/6/2010 | P | PART |
Mike Jordan
|
|
|
ben Phone #: ###-####. Noted that contractor incorrectly placed verts in several loactions at piers. This will require an rfi from engineer of record for repair and special inspection if required. Contractor to also get clarification on pier detail regarding the #3 rebar at 6 inches on center.
|
BLD-Footing | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PASS |
Jim Storey
|
|
|
jay - late afternoon please Phone #: ###-####
|
BLD-Footing | 3/26/2010 | 3/29/2010 | 3/29/2010 | A | NR |
Mike Jordan
|
|
|
curt - late morning please Phone #: ###-####. Spoke with curt this morning, he noted some set back issues with bldg. Noted that bldg. is going to have to be moved 3ft. closer to exisiting bldg. to meet the rear setback. Noted to curt to contact plan review and zoning. Plans may have to be resubmitted to city for approval.
|