BLD-Final | 2/24/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Jim Sly
|
|
|
Bruce Phone #: ###-#### OK for Perm Occ. Called Public works....No inspection required.
|
BLD-Final | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | NR |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Needs zoning final. Landscapping not yet completed.
|
FIRE-Final Inspection | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide the latest approved plans showing the door addition and repair the exit sign over the west facing exit doors.
|
BLD-Energy code compliance | 10/15/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Mike Jordan
|
|
|
Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Mike Jordan
|
|
|
Bruce Phone #: ###-####. Mstc straps installed. Also recieved enginering for TJI used for roof joist.
|
BLD-Framing/Rough-in | 10/14/2009 | 10/15/2009 | 10/15/2009 | A | PART |
Mike Jordan
|
|
|
bruce Phone #: ###-####. Needs to install mststraps as shown on plan. Also provide engineering showing tji installed will be ok for the roof loads applied.
|
BLD-Framing/Rough-in | 9/16/2009 | 9/16/2009 | 9/17/2009 | P | PART |
Jim Sly
|
|
|
Bruce-shear nail inspection please Phone #: ###-#### Ext shear nailing OK
|
BLD-Footing | 8/17/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Jim Sly
|
|
|
bruce - late afternoon please Phone #: ###-#### Wall OK
|
BLD-Footing | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Jim Sly
|
|
|
bruce - late afternoon please Phone #: ###-#### No special insp required. OK
|