Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-00980
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 4610 W HILLCREST DR
Project NameHillcrest Country Club
Customer Number08-007
ePlanReviewNo
Description
Hillcrest Country Club - Phase I Addition and Remodel - Phase I includes remodel of the entire building on the west side of the fire wall, plus 750 square feet on the east side of the fire wall (everything west of grid line S). To demo and remove the structure at the Garden Court areas. To demo and removed most of the interior partitions, ceilings and finishes, except at Mech/Elect Room #124 and the stairways. Demo and remove a large portion of the west exterior wall, planters and exterior stairways. To construct a new 4,150 sq. ft. basement and 3,875 sq. ft., wood framed first floor addition on the west end of the existing club house building. To construct new covered patio and entry areas. To refinish the interior to include new men's and women's lounges, showers, locker rooms and restrooms, new golf shop, fitness area, kitchen and bar/dining area. There is a two-hour, masonry fire wall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the fire wall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase I of the project only. A separate tenant improvement permit will be required to finish Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/29/20107/30/20107/30/2010APASS
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Mike Shain
FIRE-Final Inspection7/26/20107/27/20107/27/2010APASS
DetailsTroy Cobbley
Life safety for phase 1 passed.
FIRE-Final Inspection7/9/20107/12/20107/12/2010AFAIL
DetailsTroy Cobbley
The project related fire sprinkler permit needs addressed and "indicators" and "stickers" shall be provided per IFC 1008.1.8.3 (2.1) and (2.2) at doors 126A, 130A and 132B.
FIRE-Final Inspection7/8/20107/9/20107/9/2010ACANC
DetailsTroy Cobbley
To be rescheduled for monday
FIRE-Final Inspection6/8/20106/9/20106/9/2010APART
DetailsTroy Cobbley
A temporary was given with Marks permission until the remaining life safety items previously listed are addressed.
BLD-Final6/8/20106/9/20106/9/2010APART
DetailsTom Arcoraci
Inspection requested from web by: Mike Shain Phone #: ###-#### ok for temp, ok for final when hardware is complete
FIRE-Final Inspection6/2/20106/2/20106/2/2010AFAIL
DetailsTroy Cobbley
This inspection entry is for phone conversations between Mike and I and discussions with Jason and John. Item #1: Per Jason and John the exit doors from the covered patio into the main corridor will be allowed to have key locking hardware as long as all requirements are met such as the indicator, sticker also an exit sign is required above the door as well as emergency lighting in the covered patio area. Item #2: Per John and I's discussion the pocket/half door at the bar will not be required to have accessible hardware as long as the pocket door is in the open position during business hours. Item #3: Per Jason and I's discussion the three sets of double doors from the Pro Shop, Fitness Area and Dining Area will not be allowed to have manual flush bolts in the inactive leaf or keyed locking hardware on the egress side of the active leaf. These doors must comply with IFC 1008.1.8.3 and 1008.1.8.4.
FIRE-Final Inspection5/26/20106/1/20106/1/2010AFAIL
DetailsTroy Cobbley
See correction notice for deficiencies.
BLD-Conference5/20/20105/21/20105/21/2010ACANC
DetailsJim Sly
Mike phone
BLD-Other5/20/20105/20/20105/20/2010PCANC
DetailsJim Sly
need zoning/ landscape occupancy card sign off Inspection requested from web by: Mike Shain Phone #: ###-####
Mike to call Zoning Dept.
BLD-Other4/19/20104/20/20104/20/2010APASS
DetailsTom Arcoraci
ceiling cover Inspection requested from web by: Mike Shain Phone #: ###-####
BLD-Wall cover4/1/20104/2/20104/2/2010APASS
DetailsTom Arcoraci
Vern ###-#### Inspection requested from web by: Mike Shain fire retardent ply wood on deck
BLD-Conference2/9/20102/9/20102/9/2010PPASS
DetailsTom Arcoraci
Fire wall reinspection I need Tom per Dave Hannah Inspection requested from web by: Mike Shain arch has corrected the plan
BLD-Conference2/1/20102/1/20102/1/2010PPART
DetailsDave Hannah
Fire wall inspection Phone #: ###-#### Internet Inspection Request from: Mike Shain talked with contractor about details for eves on each side of fire wall it looks like the arct got the cut in the wrong spot contractor will call aect and also get tom envoled
BLD-Framing/Rough-in12/23/200912/24/200912/24/2009APART
DetailsTom Arcoraci
Framing rough in exsisting athletic building Phone #: ###-#### Internet Inspection Request from: Mike Shain wip ok
BLD-Energy code compliance12/15/200912/15/200912/15/2009PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Mike Shain
BLD-Framing/Rough-in12/11/200912/14/200912/14/2009PPART
DetailsTom Arcoraci
Framing west end addition Phone #: ###-#### Internet Inspection Request from: Mike Shain wip ok