BLD-Final | 7/29/2010 | 7/30/2010 | 7/30/2010 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Shain
|
FIRE-Final Inspection | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety for phase 1 passed.
|
FIRE-Final Inspection | 7/9/2010 | 7/12/2010 | 7/12/2010 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire sprinkler permit needs addressed and "indicators" and "stickers" shall be provided per IFC 1008.1.8.3 (2.1) and (2.2) at doors 126A, 130A and 132B.
|
FIRE-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for monday
|
FIRE-Final Inspection | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary was given with Marks permission until the remaining life safety items previously listed are addressed.
|
BLD-Final | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PART |
Tom Arcoraci
|
|
|
Inspection requested from web by: Mike Shain Phone #: ###-#### ok for temp, ok for final when hardware is complete
|
FIRE-Final Inspection | 6/2/2010 | 6/2/2010 | 6/2/2010 | A | FAIL |
Troy Cobbley
|
|
|
This inspection entry is for phone conversations between Mike and I and discussions with Jason and John. Item #1: Per Jason and John the exit doors from the covered patio into the main corridor will be allowed to have key locking hardware as long as all requirements are met such as the indicator, sticker also an exit sign is required above the door as well as emergency lighting in the covered patio area. Item #2: Per John and I's discussion the pocket/half door at the bar will not be required to have accessible hardware as long as the pocket door is in the open position during business hours. Item #3: Per Jason and I's discussion the three sets of double doors from the Pro Shop, Fitness Area and Dining Area will not be allowed to have manual flush bolts in the inactive leaf or keyed locking hardware on the egress side of the active leaf. These doors must comply with IFC 1008.1.8.3 and 1008.1.8.4.
|
FIRE-Final Inspection | 5/26/2010 | 6/1/2010 | 6/1/2010 | A | FAIL |
Troy Cobbley
|
|
|
See correction notice for deficiencies.
|
BLD-Conference | 5/20/2010 | 5/21/2010 | 5/21/2010 | A | CANC |
Jim Sly
|
|
|
Mike phone
|
BLD-Other | 5/20/2010 | 5/20/2010 | 5/20/2010 | P | CANC |
Jim Sly
|
|
|
need zoning/ landscape occupancy card sign off Inspection requested from web by: Mike Shain Phone #: ###-#### Mike to call Zoning Dept.
|
BLD-Other | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Tom Arcoraci
|
|
|
ceiling cover Inspection requested from web by: Mike Shain Phone #: ###-####
|
BLD-Wall cover | 4/1/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Tom Arcoraci
|
|
|
Vern ###-#### Inspection requested from web by: Mike Shain fire retardent ply wood on deck
|
BLD-Conference | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | PASS |
Tom Arcoraci
|
|
|
Fire wall reinspection I need Tom per Dave Hannah Inspection requested from web by: Mike Shain arch has corrected the plan
|
BLD-Conference | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | PART |
Dave Hannah
|
|
|
Fire wall inspection Phone #: ###-#### Internet Inspection Request from: Mike Shain talked with contractor about details for eves on each side of fire wall it looks like the arct got the cut in the wrong spot contractor will call aect and also get tom envoled
|
BLD-Framing/Rough-in | 12/23/2009 | 12/24/2009 | 12/24/2009 | A | PART |
Tom Arcoraci
|
|
|
Framing rough in exsisting athletic building Phone #: ###-#### Internet Inspection Request from: Mike Shain wip ok
|
BLD-Energy code compliance | 12/15/2009 | 12/15/2009 | 12/15/2009 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Shain
|
BLD-Framing/Rough-in | 12/11/2009 | 12/14/2009 | 12/14/2009 | P | PART |
Tom Arcoraci
|
|
|
Framing west end addition Phone #: ###-#### Internet Inspection Request from: Mike Shain wip ok
|