BLD-Final | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory with the exception of missing address numbers to be posted prior to building structural final inspection as agreed.
|
BLD-Energy code compliance | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | PASS |
Jim Storey
|
|
|
tim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2009 | 9/25/2009 | 9/25/2009 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### ok to insulate/ isolate return air duct.
|
BLD-Framing/Rough-in | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### roof framing ok/ sheer nailling ok/ need resbmital to remove adaramp. and use front entrance that is compliant.
|
BLD-Foundation | 7/22/2009 | 7/22/2009 | 7/22/2009 | P | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-#### pending si for epoxy rebar ok
|