Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-01024
StatusFinaled
Name TRENT KOCI
Site Address 12376 W EXECUTIVE DR
Project NameOregon Tile and Marble -Shell
Customer Number 
ePlanReviewNo
Description
Oregon Tile and Marble (Shell Only) - To construct a new 28,670 square foot, one story, retail, business and storage shell building and related site improvements. This building is constructed of concrete tilt-up exterior walls and steel structural roof and interior structural supports. The shell will include the construction of a fire riser room and mechanical room. This building is fully fire sprinkled. The sprinklers are used for area increase and S-1 Occupancy fire area. This is shell permit only and no occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. The plumbing, mechanical and electrical work shown on the approved plans are part of the shell construction. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/12/20102/12/20102/12/2010PPASS
DetailsMike Jordan
DOC - Permit Finaled2/12/20102/12/20102/12/2010PPASS
DetailsMike Jordan
Letter of compliance issued. Verified all other signatures.
FIRE-Final Inspection2/5/20102/8/20102/8/2010APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection2/4/20102/5/20102/5/2010PFAIL
DetailsTroy Cobbley
The life safety will be ok to pass when the project related fire alarm and sprinkler permits are finaled. The gate to the parking lot has not been installed yet but there is atleast 20' of clearance and the key for the lock on the gate is going to be provided in the knox box.
BLD-Energy code compliance12/21/200912/22/200912/22/2009APASS
DetailsMike Jordan
Already inspected on Friday 12/18/09 Phone #: ###-#### Internet Inspection Request from: Mike Walling
BLD-Energy code compliance12/21/200912/21/200912/21/2009PPASS
DetailsMike Jordan
Remainder of shell ok.
BLD-Energy code compliance10/22/200910/22/200910/22/2009PPART
DetailsMike Jordan
Mike Phone #: ###-####West and north perimeter walls.
BLD-Framing/Rough-in10/21/200910/21/200910/21/2009APASS
DetailsMike Jordan
Interior steel stud walls for 1hr. riser room enclosure,mech room and fur out walls at west and north perimeter walls.
BLD-Energy code compliance10/1/200910/1/200910/1/2009APART
DetailsMike Jordan
Insulation at front showroom area only.
BLD-Framing/Rough-in9/25/20099/28/20099/28/2009APART
DetailsMike Jordan
Mike Phone #: ###-####. Interior steel stud framed walls for showroom only. Pending elec ri. inspection.
BLD-Concrete8/17/20098/18/20098/18/2009APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/17/2009 at 3:14:28 PM. Contact: ###-####. Concrete tilt panels. Noted incorrect pier spacing on N1 and N2 panels. Noted to contractor to specialinspector note on report that these two panels were repaired.
BLD-Footing8/3/20098/4/20098/4/2009APASS
DetailsMike Jordan
mike Phone #: ###-####. Concrete tilt panels, E panels. Also reviewed special inspection reports to date. ok.
BLD-Foundation8/3/20098/3/20098/3/2009PPASS
DetailsMike Jordan
mike Phone #: ###-####
BLD-Footing7/16/20097/16/20097/17/2009PPASS
DetailsTom Arcoraci
Inspect as discussed. Contact person Mike Walling @ ###-#### pending spec by mti