BLD-Final | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued. Verified all other signatures.
|
FIRE-Final Inspection | 2/5/2010 | 2/8/2010 | 2/8/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 2/4/2010 | 2/5/2010 | 2/5/2010 | P | FAIL |
Troy Cobbley
|
|
|
The life safety will be ok to pass when the project related fire alarm and sprinkler permits are finaled. The gate to the parking lot has not been installed yet but there is atleast 20' of clearance and the key for the lock on the gate is going to be provided in the knox box.
|
BLD-Energy code compliance | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PASS |
Mike Jordan
|
|
|
Already inspected on Friday 12/18/09 Phone #: ###-#### Internet Inspection Request from: Mike Walling
|
BLD-Energy code compliance | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Mike Jordan
|
|
|
Remainder of shell ok.
|
BLD-Energy code compliance | 10/22/2009 | 10/22/2009 | 10/22/2009 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####West and north perimeter walls.
|
BLD-Framing/Rough-in | 10/21/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Mike Jordan
|
|
|
Interior steel stud walls for 1hr. riser room enclosure,mech room and fur out walls at west and north perimeter walls.
|
BLD-Energy code compliance | 10/1/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Mike Jordan
|
|
|
Insulation at front showroom area only.
|
BLD-Framing/Rough-in | 9/25/2009 | 9/28/2009 | 9/28/2009 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Interior steel stud framed walls for showroom only. Pending elec ri. inspection.
|
BLD-Concrete | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/17/2009 at 3:14:28 PM. Contact: ###-####. Concrete tilt panels. Noted incorrect pier spacing on N1 and N2 panels. Noted to contractor to specialinspector note on report that these two panels were repaired.
|
BLD-Footing | 8/3/2009 | 8/4/2009 | 8/4/2009 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####. Concrete tilt panels, E panels. Also reviewed special inspection reports to date. ok.
|
BLD-Foundation | 8/3/2009 | 8/3/2009 | 8/3/2009 | P | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
BLD-Footing | 7/16/2009 | 7/16/2009 | 7/17/2009 | P | PASS |
Tom Arcoraci
|
|
|
Inspect as discussed. Contact person Mike Walling @ ###-#### pending spec by mti
|