BLD-Final | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Dave Hannah
|
|
|
jess Phone #: ###-#### ok for perm occ
|
FIRE-Alarm Testing | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Forrest France
|
|
|
Inspection intended for a fire final. Fire life safety passed.
|
FIRE-Conference | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | DONE |
Forrest France
|
|
|
On site review of project related fire life safety issues including fire sprinklers, suite addressing, fire extinguishers, occupant load signs, door hardware, and related trade permits.
|
BLD-Final | 9/8/2009 | 9/8/2009 | 9/9/2009 | P | NR |
Dave Hannah
|
|
|
jeff Phone #: ###-#### need fire finals
|
BLD-Final | 9/1/2009 | 9/2/2009 | 9/3/2009 | A | NR |
Dave Hannah
|
|
|
Jeff if possible later am Phone #: ###-#### needs other trades finaled first
|
FIRE-Conference | 8/10/2009 | 8/10/2009 | 8/10/2009 | P | DONE |
Forrest France
|
|
|
Regarding project related hood suppression permit work and location of the manual release.
|
BLD-Framing/Rough-in | 8/6/2009 | 8/7/2009 | 8/7/2009 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|