Permit Information
Permit NumberBLD09-01127
StatusFinaled
Name SHIGE
Site Address 150 N 8TH ST Unit: 217
Project NameShige
Customer Number 
ePlanReviewNo
Description
(Shige 150 N. 8th) ***Modification, court area will be added for additional seating with work to include the construction of a screen wall***Tenant improvement to an existing restaurant expanding the the existing Shige express into the space previously occupied by Gino's. Work to include the addition of two type I grease hoods attached to an existing exhaust fan and duct (the original duct was required to be in a one hour Shaft, confirm in field the one hour shaft) , the addition of 4 grills and associated gas piping and associated misc. related finishes. All work to be done per the approved plans, plan review report and any notations. This building is fully sprinkled, any alterations to the existing sprinkler system requires a separate permit and shall comply with NFPA 13 as regulated by the City of Boise fire Department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/23/200910/23/200910/24/2009PPASS
DetailsDave Hannah
###-#### Annie
BLD-Framing/Rough-in10/23/200910/23/200910/23/2009APASS
DetailsDave Hannah
###-#### Annie
FIRE-Final Inspection10/23/200910/23/200910/23/2009PPASS
DetailsForrest France
C/N items field verified for completion, fire life safety okay for final, lever hardware at the two back doors to be installed prior to final per plans and as discussed.
FIRE-Final Inspection10/22/200910/22/200910/22/2009PFAIL
DetailsForrest France
See fire code review notes for details, noted missing max. occupant load sign, need to install two exit signs per approved drawings, provide two class K and one 2A10BC fire extinguishers and post as discussed, tenant addresses must match permit documents, tags at the hood suppression systems are missing, etc., discussed issues with the owner/operators on site.
BLD-Final10/20/200910/21/200910/22/2009PNR
DetailsDave Hannah
debbie Phone #: ###-#### needs mec, plumb,and fire finals first
BLD-Framing/Rough-in10/12/200910/13/200910/13/2009PCANC
DetailsDave Hannah
Debbie-inspection for counter please Phone #: ###-####
BLD-Framing/Rough-in9/23/20099/24/20099/25/2009PPART
DetailsDave Hannah
Wes Phone #: ###-#### ok to cover patio walls
BLD-Conference8/24/20098/24/20098/25/2009PFAIL
DetailsDave Hannah
Wes Jones-to discuss patio please Phone #: ###-#### needs to go back to plan review
BLD-Conference8/21/20098/24/20098/24/2009ACANC
DetailsDave Hannah
Wes Jones-to discuss patio please Phone #: ###-####