Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-01155
StatusFinaled
Name STRONGHOLD REMODELING
Site Address 958 E BRAEMERE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
For the partial reconstruction and additon to an existing deck with work to include the replacement of joists and decking on the upper deck and the addition of piers, support columns, beams and posts and a new stair system and railings. The lower deck will include the installation ofnew decking, stairs and railing. The existing ledger will be reused on the upper deck. All work to be done per the approved plans, plan review report and any notations. A geotechnical report will be required prior to foundation placement, call Terry Records.R1-B and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/15/200910/15/200910/15/2009PPASS
DetailsTony Young
Craig Phone #: ###-####
new wood hand rails meet code
DOC - Permit Finaled10/15/200910/15/200910/15/2009PPASS
DetailsTony Young
BLD-Final9/17/20099/17/20099/17/2009PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/17/2009 at 9:31:49 AM. Contact: ###-####.
Contr removed top cap of handrail to see if profile of pc remaining above metal guards would meet code. Did not meet Section R-311.5.6. Reviewed this section with contractor.
BLD-Conference7/28/20097/28/20097/29/2009PFAIL
DetailsTony Young
amy Phone #: ###-####
sample of hand rail does not meet code
BLD-Footing7/16/20097/16/20097/16/2009PPASS
DetailsTony Young
david Phone #: ###-####