Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD09-01272
StatusFinaled
Name WESTWOOD CONTRACTORS INC
Site Address 8300 W EMERALD ST
Project NameREI
Customer Number 
ePlanReviewNo
Description
(REI - Mechanical Unit Replacement) **PLAN MODIFICATION: Plan modification to install two new bike lifts per new floor plans and attached engineering.** Permit is to replace old roof top mechanical units and install additional structural support. Approval per approved plans on file and attached structural engineering. Work to include: installation of new ducts and diffusers, replacement of 5 roof top mechanical units, electrical upgrades, installation of new structural reinforcement, and installation of additional gas piping. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. This permit will require the new smoke detection system to be interconnected with the existing alarm system and an alarm permit form Boise City Fire Dept. **PLAN MODIFICATION: Plan modification to install two new bike lifts per new floor plans and attached engineering.** **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/22/200910/23/200910/23/2009APASS
DetailsMike Jordan
Fred store does not open until 10 am Phone #: ###-####
DOC - Permit Finaled10/23/200910/23/200910/23/2009PPASS
DetailsMike Jordan
FIRE-Final Inspection10/22/200910/23/200910/23/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection9/3/20099/4/20099/4/2009AFAIL
DetailsTroy Cobbley
Life safety not performed since the project related fire alarm permit was failed.
BLD-Final9/3/20099/4/20099/4/2009ANR
DetailsMike Jordan
fred Phone #: ###-####. Fire failed.
BLD-Conference9/3/20099/3/20099/3/2009PPASS
DetailsMike Jordan
Needs fire alarm and life safety final. All other trades final. Also reviewed special insp. report for welding done on job. ok.