BLD-Final | 5/6/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
DOC - Permit Finaled | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/6/2010 | 5/7/2010 | 5/6/2010 | A | DONE |
Dave Hannah
|
|
|
David Phone #: ###-####--Per request of David Bowman
|
BLD-Grading Inspection | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Final | 5/3/2010 | 5/4/2010 | 5/4/2010 | A | NR |
Dave Hannah
|
|
|
David Phone #: ###-#### needs hill side and fire sprink finals
|
BLD-Aging Inspection | 3/29/2010 | 3/29/2010 | 3/31/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Energy code compliance | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PASS |
Tom Arcoraci
|
|
|
DAvid Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2010 | 1/20/2010 | 1/20/2010 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | FAIL |
Dave Hannah
|
|
|
David Phone #: ###-#### needs to install seal package for energy code before framing inspection also mec no oked for rough in city set of plans are wet and stuck in tube cant get them out esc also needs work site needs to be cleaned up mud cleaned off sidewalks road and gutters and drains need to be cleaned
|
BLD-Foundation | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PASS |
Dave Hannah
|
|
|
Santos Phone #: ###-####
|
BLD-Footing | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### no soils signoff
|
BLD-Foundation | 9/17/2009 | 9/18/2009 | 9/18/2009 | A | PART |
Dave Hannah
|
|
|
Santos Phone #: ###-#### ok to pour basement walls
|
BLD-Foundation | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | CANC |
Dave Hannah
|
|
|
santos Phone #: ###-####
|
BLD-Footing | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PASS |
Mike Jordan
|
|
|
Santos ###-####. Footings for basement walls only.
|