Permit Information
Permit NumberBLD09-01336
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 519 N ALLUMBAUGH ST
Project NameDarigold
Customer Number 
ePlanReviewNo
Description
Darigold - Pre-treatment tank and equipment building - To construct a 1,176 square foot CMU block equipment building (unocupied) and install a 7,776 square foot pre-treatment tank, located on the West side of Allumbaugh Street across from the existing production plant. All work per the approved plans, Engineering, and attached plan review report. DRH09-00148 **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/23/20106/23/20107/1/2010 PASS
DetailsJim Storey
BLD-Final6/30/20106/30/20106/30/2010APASS
DetailsJim Storey
DOC - Permit Finaled6/30/20106/30/20106/30/2010PPASS
DetailsJim Storey
BLD-Final4/23/20104/23/20104/23/2010APART
DetailsJim Storey
tempok for final pending zoning sign off.
FIRE-Final Inspection4/19/20104/20/20104/20/2010APASS
DetailsForrest France
Life safety inspection passed.
FIRE-Conference3/29/20103/29/20103/29/2010ADONE
DetailsForrest France
Ref. activity notes 3/26
FIRE-Final Inspection3/25/20103/26/20103/26/2010APASS
DetailsForrest France
Life safety inspection completed satisfactory. Noted some site work incomplete. Existing hydrant locations approved per M. Sentenno- see plan review comments.
FIRE-Final Inspection3/25/20103/25/20103/26/2010PDONE
DetailsForrest France
FPP insp. request #: ###-####
BLD-Final3/24/20103/25/20103/25/2010APART
DetailsJim Storey
Ron Phone #: ###-#### bld final ok pending landscapping.
BLD-Aging Inspection2/18/20102/18/20102/18/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection12/8/200912/8/200912/8/2009 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in10/5/200910/5/200910/5/2009PPASS
DetailsJim Storey
Ron Phone #: ###-#### roof framiming ok ofr exterior cover/ pending trade ri and insulation insp.
BLD-Other9/30/20099/30/20099/30/2009PPASS
DetailsJim Storey
CMU inspection please around 1:30 if possible Phone #: ###-#### topped out with cmu/ rebar ok si on site.
BLD-Footing9/28/20099/29/20099/29/2009APART
DetailsJim Storey
ron - re-bar Phone #: ###-#### topped out n and south walls as well as center wall.ok pending si report rebar ok.
BLD-Concrete9/25/20099/25/20099/25/2009PPART
DetailsJim Storey
Ron Phone #: ###-#### first lift of cmu blk placment in progess rebar in the process of being placed all is progressing ok si to be on site monday for insp. of grout and remainder of rebar.
BLD-Foundation9/17/20099/17/20099/17/2009PPASS
DetailsJim Storey
Ian Phone #: ###-#### pending si report insp. was eraler in the day.
BLD-Conference9/17/20099/17/20099/17/2009APASS
DetailsJim Storey
ring rebar lap ok and placment ok form work in progress/ reviewed w/derill the supper as to si procegers.
BLD-Foundation9/16/20099/16/20099/16/2009PPASS
DetailsJim Storey
ron//want right after lunch if possible Phone #: ###-#### rebar ok and lap to cmu ok wall ok
BLD-Footing9/15/20099/15/20099/15/2009PPASS
DetailsJim Storey
ron - right after lunch if possible Phone #: ###-####
BLD-Footing9/14/20099/15/20099/15/2009APASS
DetailsJim Storey
Ian-late am if possible please Phone #: ###-#### si on site pending report soil report done ft for building ok/ rat slab for tank ok