BLD-Aging Inspection | 6/23/2010 | 6/23/2010 | 7/1/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/30/2010 | 6/30/2010 | 6/30/2010 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/30/2010 | 6/30/2010 | 6/30/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/23/2010 | 4/23/2010 | 4/23/2010 | A | PART |
Jim Storey
|
|
|
tempok for final pending zoning sign off.
|
FIRE-Final Inspection | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
FIRE-Conference | 3/29/2010 | 3/29/2010 | 3/29/2010 | A | DONE |
Forrest France
|
|
|
Ref. activity notes 3/26
|
FIRE-Final Inspection | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory. Noted some site work incomplete. Existing hydrant locations approved per M. Sentenno- see plan review comments.
|
FIRE-Final Inspection | 3/25/2010 | 3/25/2010 | 3/26/2010 | P | DONE |
Forrest France
|
|
|
FPP insp. request #: ###-####
|
BLD-Final | 3/24/2010 | 3/25/2010 | 3/25/2010 | A | PART |
Jim Storey
|
|
|
Ron Phone #: ###-#### bld final ok pending landscapping.
|
BLD-Aging Inspection | 2/18/2010 | 2/18/2010 | 2/18/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/8/2009 | 12/8/2009 | 12/8/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/5/2009 | 10/5/2009 | 10/5/2009 | P | PASS |
Jim Storey
|
|
|
Ron Phone #: ###-#### roof framiming ok ofr exterior cover/ pending trade ri and insulation insp.
|
BLD-Other | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PASS |
Jim Storey
|
|
|
CMU inspection please around 1:30 if possible Phone #: ###-#### topped out with cmu/ rebar ok si on site.
|
BLD-Footing | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | PART |
Jim Storey
|
|
|
ron - re-bar Phone #: ###-#### topped out n and south walls as well as center wall.ok pending si report rebar ok.
|
BLD-Concrete | 9/25/2009 | 9/25/2009 | 9/25/2009 | P | PART |
Jim Storey
|
|
|
Ron Phone #: ###-#### first lift of cmu blk placment in progess rebar in the process of being placed all is progressing ok si to be on site monday for insp. of grout and remainder of rebar.
|
BLD-Foundation | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PASS |
Jim Storey
|
|
|
Ian Phone #: ###-#### pending si report insp. was eraler in the day.
|
BLD-Conference | 9/17/2009 | 9/17/2009 | 9/17/2009 | A | PASS |
Jim Storey
|
|
|
ring rebar lap ok and placment ok form work in progress/ reviewed w/derill the supper as to si procegers.
|
BLD-Foundation | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PASS |
Jim Storey
|
|
|
ron//want right after lunch if possible Phone #: ###-#### rebar ok and lap to cmu ok wall ok
|
BLD-Footing | 9/15/2009 | 9/15/2009 | 9/15/2009 | P | PASS |
Jim Storey
|
|
|
ron - right after lunch if possible Phone #: ###-####
|
BLD-Footing | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Jim Storey
|
|
|
Ian-late am if possible please Phone #: ###-#### si on site pending report soil report done ft for building ok/ rat slab for tank ok
|