BLD-Final | 11/17/2009 | 11/17/2009 | 11/18/2009 | P | PASS |
Dave Hannah
|
|
|
Please call 1/2 hour upon arrival, thanks. Phone #: ###-#### Internet Inspection Request from: Darren Gossett
|
FIRE-Final Inspection | 11/17/2009 | 11/17/2009 | 11/17/2009 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion, fire life safety final approved.
|
FIRE-Final Inspection | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | NR |
Forrest France
|
|
|
Items noted include two fire extinguishers at the 2nd floor common corridor overdue current annual certification, remove dust cover at the smoke detector, replace drop ceiling tiles to maintain thermal response for the pendent sprinklers, clear path of egress where obstructed at the first floor corridors.
|
FIRE-Final Inspection | 11/9/2009 | 11/10/2009 | 11/10/2009 | A | NR |
Forrest France
|
|
|
Building life safety final pending project related fire alarm work.
|
FIRE-Final Inspection | 11/3/2009 | 11/3/2009 | 11/3/2009 | P | NR |
Forrest France
|
|
|
Pending project related fire alarm permit work final.
|
BLD-Conference | 10/15/2009 | 10/15/2009 | 10/16/2009 | P | PART |
Dave Hannah
|
|
|
Please call 1/2 hour upon arrival thanks, Darren Phone #: ###-#### Internet Inspection Request from: Darren Gossett ok to cover ceiling
|
BLD-Framing/Rough-in | 9/24/2009 | 9/25/2009 | 9/25/2009 | A | PASS |
Dave Hannah
|
|
|
Please call 1/2 hour upon arrival, thanks. Darren Phone #: ###-#### Internet Inspection Request from: Darren Gossett ok to cover after elec r/i
|