Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-01420
StatusExpired
Name ROCKY MOUNTAIN LLC
Site Address 1025 W BELMONT ST
Project NameThe Biblical Studies Center
Customer Number 
ePlanReviewNo
Description
(THE BIBLICAL STUDIES CENTER) Permit is to remodel the front entry ceiling to a new rigid ceiling with fake beam decor. Approval per approved plans on file and structural engineering attached to the plans. Work to include: demolition of existing ceiling, construction of new ceiling (including décor), replacement of existing cant. lighting with new cant. lights, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired8/9/20108/9/20108/9/2010APASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
BLD-Aging Inspection8/4/20108/4/20108/9/2010 PASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
BLD-Aging Inspection5/31/20105/31/20106/8/2010 FAIL
DetailsJim Storey
no call for insp.
BLD-Conference6/3/20106/4/20106/8/2010PFAIL
DetailsJim Storey
no call for insp,
BLD-Aging Inspection3/31/20103/31/20104/1/2010 PASS
DetailsJim Storey
BLD-Aging Inspection1/28/20101/28/20101/28/2010 NR
DetailsJim Storey
no callfor insp. ele ri action.
BLD-Aging Inspection11/24/200911/24/200911/24/2009 NR
DetailsJim Storey
no callfor insp. ele ri action.