Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD09-01425
StatusFinaled
Name MATHIEU CHOUX
Site Address 200 N CAPITOL BLVD
Project NameADELMAN BLDG - BASEMENT
Customer Number 
ePlanReviewNo
Description
(CATACOMB LOUNGE - BASEMENT) The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the building. To change a 1,919 square foot basement banquet room into a lounge. Work is to include an elevated floor, a ramp accessible to the disabled, an elevated disk jockey platform, steps, handrails, a bar, tables, and chairs. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/200910/19/200910/22/2009APASS
DetailsDave Hannah
Matthew ###-####
BLD-Final10/6/200910/7/200910/9/2009PNR
DetailsDave Hannah
mathew Phone #: ###-####
FIRE-Final Inspection10/6/200910/7/200910/7/2009APASS
DetailsForrest France
Fire life safety final okay pending installation of one fire extinguisher, post max occupant load sign, repair one EM light at the back exit corridor. Items to be done prior to structural final approval.
FIRE-Conference9/30/200910/1/200910/1/2009ADONE
DetailsForrest France
On site conference regarding fire code review notes, general requirements, new raised platforms, fire sprinkler coverage, etc.
FIRE-Conference9/30/20099/30/20099/30/2009PDEFR
DetailsForrest France
Scheduled for 10/1 as discussed.
BLD-Conference9/29/20099/29/20099/29/2009PDONE
DetailsDave Hannah
Mathieu Phone #: ###-####