BLD-Final | 4/21/2010 | 4/23/2010 | 4/23/2010 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 4/19/2010 | 4/20/2010 | 4/21/2010 | A | CANC |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 12/4/2009 | 12/4/2009 | 12/4/2009 | A | CANC |
Jim Storey
|
|
|
time test
|
BLD-Footing | 12/4/2009 | 12/4/2009 | 12/4/2009 | A | PASS |
Jim Storey
|
|
|
last of interior ft at east addition shell. 1 hr
|
BLD-Footing | 11/23/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Jim Storey
|
|
|
interior bearing strip ft rebar ok.
|
BLD-Foundation | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PASS |
Jim Storey
|
|
|
north interior ft and wall rebar ok of shell bld.
|
FIRE-Conference | 11/13/2009 | 11/13/2009 | 11/13/2009 | A | DONE |
Forrest France
|
|
|
On site meeting with general and subcontractors regarding facility program guidelines.
|
BLD-Wall cover | 11/13/2009 | 11/13/2009 | 11/13/2009 | P | PASS |
Jim Storey
|
|
|
1:00 grout pour
|
BLD-Conference | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Jim Storey
|
|
|
10:00 am appointment meeting of trades and inspectors to go over facilitity insp. protacall .
|
BLD-Footing | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jim Storey
|
|
|
interior ft appointmet 2:30 north and south sides
|
BLD-Conference | 11/10/2009 | 11/10/2009 | 11/10/2009 | A | CANC |
Jim Storey
|
|
|
time test
|
BLD-Foundation | 11/10/2009 | 11/10/2009 | 11/10/2009 | A | PASS |
Jim Storey
|
|
|
east loading dock wall. rebar ok 1 hr sch. for meetting on fri at 10:00 am with facilitys group and contrators to go over job and protacall.
|
BLD-Foundation | 11/5/2009 | 11/6/2009 | 11/6/2009 | A | PASS |
Jim Storey
|
|
|
10:30 or 11:00 appointment for dock wall. southeast wall ok 45min.
|
BLD-Foundation | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | CANC |
Jim Storey
|
|
|
2:00 appointment.
|
BLD-Wall cover | 11/5/2009 | 11/5/2009 | 11/5/2009 | A | PASS |
Jim Storey
|
|
|
1 st course cmu tank and exitway from plant northwest corner of plant. ok
|
BLD-Footing | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Jim Storey
|
|
|
south side to complet exterior of addition ok/ rebar ok
|
BLD-Footing | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PASS |
Jim Storey
|
|
|
west tank pad ft for rebar insp. 3:30 apointment w/ron ab and weld plats set with rebar double mat ok for cover west tank pad.
|
BLD-Foundation | 10/29/2009 | 10/29/2009 | 10/29/2009 | P | PASS |
Jim Storey
|
|
|
3:00 pm appt. east wall insp. center srction of wall east end of addition rebar ok si onsite/ weld plates set.
|
BLD-Footing | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | PASS |
Jim Storey
|
|
|
2:30 appointment east ft and rebar of main building ok to place concrete/ compaction ok
|
BLD-Wall cover | 10/26/2009 | 10/26/2009 | 10/26/2009 | P | PASS |
Jim Storey
|
|
|
grout placement north dock 5th lift rebar ok
|
BLD-Footing | 10/26/2009 | 10/26/2009 | 10/26/2009 | P | PASS |
Jim Storey
|
|
|
wall northside main addition rebar and weld plates inplace ok
|
BLD-Other | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Jim Storey
|
|
|
north dock 4th lift of cmu wall bond beam rebar ok for 4th lift at north dock area ie over door opening.
|
BLD-Footing | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Jim Storey
|
|
|
ft insp for main building appt:11:30 301 ft for main addition north side rebar inplace and ok to place concrete/ ft at tank pad for building wall north west area ok to place concrete/
|
BLD-Other | 10/21/2009 | 10/22/2009 | 10/22/2009 | A | PASS |
Jim Storey
|
|
|
3rd lift north dock around 11:00 am
|
BLD-Wall cover | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Jim Storey
|
|
|
2nd lift recieving dock north side late insp. rebar ok si to test grout on sch.
|
BLD-Footing | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Jim Storey
|
|
|
northwest 60000 tank rebar as perplan si to be on site at placment.
|
BLD-Wall cover | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PART |
Jim Storey
|
|
|
cmu first lift receiving dock north side
|
BLD-Foundation | 10/15/2009 | 10/15/2009 | 10/15/2009 | P | PASS |
Jim Storey
|
|
|
rebar ok nw area si pending
|
BLD-Footing | 10/14/2009 | 10/14/2009 | 10/14/2009 | P | PART |
Jim Storey
|
|
|
ron Phone #: ###-#### ft for bld. northwest corner of building rebar ok si onsite taking concrete samples.
|