BLD-Final | 2/9/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. all issues resolved. ok for perm occ.
|
BLD-Final | 2/8/2010 | 2/9/2010 | 2/9/2010 | P | FAIL |
Mike Jordan
|
|
|
John Phone #: ###-####. Needs to provide Listed data for Penetrations, Also needs to repair 2hr. wall in canopy, does not seperate completly.
|
FIRE-Final Inspection | 2/8/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The builder will provide the correct sticker at the main exit prior to the building inspection.
|
BLD-Framing/Rough-in | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior wood framed walls for restroom and demising wall. Also 2hr. fire barrier wall. Noted to contractor that he needs to provide a portion of counter to meet ada requirements as noted on approved plans. Also verified all backing for ada elements in restroom.
|
BLD-Conference | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | DONE |
Mike Jordan
|
|
|
john - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Received additional deatils from architect regarding steel beam and wood truss penetrations. Will discuss wtih structural supervisor. Contractor also wants to change were 2hr. fire barrier wall passes through canopy section. Noted to contractor that architect would have to resubmit details to plan review for approval.
|
BLD-Conference | 1/6/2010 | 1/7/2010 | 1/7/2010 | A | DONE |
Mike Jordan
|
|
|
John please call 30 min before going out Phone #: ###-####. Met with contractor to go over 2hr. fire barrier wall details. Issued c/n for architect to provide details showing UL approved membrane and thru penetrations into 2hr. fire barrier wall, framing details for 2hr. fire barrier wall around wood truss, steel beam, connection to steel and approved UL listing for penetration of wood trusses into 2hr. fire barrier wall.
|