BLD-Final | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PASS |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/13/2011 | 4/13/2011 | 4/13/2011 | P | PART |
Jim Sly
|
|
|
OK to Occupy. C/N ...Temp Occ..... Need Erosion control finaled After landscaping.
|
BLD-Final | 4/13/2011 | 4/13/2011 | 4/13/2011 | A | CANC |
Jim Sly
|
|
|
Re-sched....
|
BLD-Final | 4/11/2011 | 4/12/2011 | 4/13/2011 | A | NR |
Jim Sly
|
|
|
Brice Phone #: ###-####
|
BLD-Final | 4/8/2011 | 4/11/2011 | 4/11/2011 | A | NR |
Jim Sly
|
|
|
Bryce Phone #: ###-#### Complete prior corr notice........
|
BLD-Final | 4/7/2011 | 4/8/2011 | 4/11/2011 | P | NR |
Jim Sly
|
|
|
bryce Phone #: ###-####
|
FIRE-Final Inspection | 4/7/2011 | 4/8/2011 | 4/8/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/5/2011 | 4/6/2011 | 4/6/2011 | P | FAIL |
Jim Sly
|
|
|
Jeremy Allen Phone #: ###-#### C/N Provide UL listings for firestopping all penitrations thru 1hr wall Mech room. Access hatch (door) to attic space from Mech room to close un-assisted and latch. Need fire life safety final.
|
BLD-Framing/Rough-in | 3/14/2011 | 3/15/2011 | 3/15/2011 | A | PART |
Jim Sly
|
|
|
Jeremy Allen Phone #: ###-#### 2 small walls......autoclave and data rooms.....pending plan modifiction for structural and fire sprinkler.
|
BLD-Final | 2/15/2011 | 2/16/2011 | 2/16/2011 | P | PART |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### OK to Occupy phase 2 area.
|
FIRE-Final Inspection | 2/15/2011 | 2/16/2011 | 2/16/2011 | A | PART |
Troy Cobbley
|
|
|
The new addition is ok to occupy. Phase III work still needs to be completed prior to a final sign off.
|
FIRE-Conference | 2/14/2011 | 2/15/2011 | 2/15/2011 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with the job superintendant. They included relocating the electric alarm bell to the new FDC location.
|
FIRE-Conference | 1/14/2011 | 1/14/2011 | 1/14/2011 | P | DONE |
Troy Cobbley
|
|
|
Prior to life safety sign off the electric alarm bell, for the fire sprinkler system, will be required to be relocated and installed at the new FDC location. The general contractor was not on site to address this issue with.
|
BLD-Conference | 11/3/2010 | 11/3/2010 | 11/3/2010 | P | CANC |
Jim Sly
|
|
|
WIP
|
BLD-Energy code compliance | 8/23/2010 | 8/24/2010 | 8/24/2010 | A | PART |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### Concealed corner spaces are filled completely with insulation.
|
BLD-Energy code compliance | 8/19/2010 | 8/20/2010 | 8/20/2010 | A | PART |
Jim Sly
|
|
|
jeremy Phone #: ###-#### Wall insulation OK main floor......Need to inspect concealed spaces at (5) corner areas built to allow for air intakes. These areas need to be filled with insulation from floor to ceiling.
|
BLD-Framing/Rough-in | 8/18/2010 | 8/18/2010 | 8/18/2010 | P | PART |
Jim Sly
|
|
|
jeremy Phone #: ###-#### Main floor except Mech room OK to insulate.
|
BLD-Framing/Rough-in | 7/22/2010 | 7/23/2010 | 7/23/2010 | A | PART |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### Small roof above crushing table OK..... Architect to advise...... Firestopping of Plumb cleanout penitrations thru membrane 1hr wall...... continuation of 1hr membrane at rim area of floor.....
|
BLD-Energy code compliance | 7/19/2010 | 7/20/2010 | 7/20/2010 | P | PART |
Dave Hannah
|
|
|
Jeremy Phone #: ###-#### walls of mezzanine ok to cover
|
BLD-Final | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | NR |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### Should have been frame insp. Flat roof OK
|
BLD-Energy code compliance | 6/21/2010 | 6/22/2010 | 6/22/2010 | P | PART |
Jim Sly
|
|
|
Jeremy Allen Phone #: ###-#### Wall pre-rocked for Electr panels......OK
|
BLD-Framing/Rough-in | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | PART |
Jim Sly
|
|
|
Roof sheating and wall sheating inspection please-Jeremy Phone #: ###-#### Roof and Exterior shear nailing OK.....except shear panel missing at panel South of door in West wall. Engineer to advise.
|
BLD-Footing | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PART |
Jim Sly
|
|
|
jeremy - rebar Phone #: ###-#### Soil grinding room.....OK pending Special inspection STRATA tests and approvals.
|
BLD-Foundation | 4/23/2010 | 4/26/2010 | 4/26/2010 | A | PART |
Jim Sly
|
|
|
slab inspectioin//Jeremy Allen Phone #: ###-#### OK pending STRATA special inspection, tests, and approvals
|
BLD-Foundation | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | PART |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### OK pending MTI inspections, tests and approvals.
|
BLD-Footing | 3/30/2010 | 3/31/2010 | 3/31/2010 | A | PART |
Jim Sly
|
|
|
Jeremy Phone #: ###-#### OK pending MTI special inspections, tests and approvals.
|