Permit Information
Permit NumberBLD09-01722
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
(ST LUKES)(3RD FLR - 3N ANESTHESIA) ***7/21/10 - PLAN MODIFICATION TO INCLUDE WORK NECESSARY TO REPLACE THE SURGICAL LIGHT BOOMS AT OPERATING ROOMS #2, #3, AND #4. WORK TO INCLUDE: SELECTIVE DEMOLITION OF THE EXISTING LIGHT BOOM MOUNTING PLATES; STRUCTURAL SUPPORT ASSEMBLY MODIFICATIONS FOR THE NEW LIGHT BOOM ATTACHMENTS; CUTTING AND PATCHING AS REQUIRED FOR NEW ELECTRICAL CONNECTIONS AND DEVICES; PATCH, REPAIR, AND RE-FINISH WALL AND CEILING SURFACES. ALL WORK PER THE APPROVED PLANS. This building is fully fire sprinkered ANY ALTERATIONS TO THE SPRINKLER SYSTEM WILL REQUIRE A SEPARATE PERMIT, and shall be installed per NFPA #13 as regulated by the fire department. SPECIAL INSPECTIONS ARE REQUIRED PER CHAPTER 17 OF THE 2006 IBC. SRZ*** Select interior demolition and remodel of portions of the third floor Cardiovascular O.R.'S, #2, #3 & #4, and the conversion of the adjacent Anesthesia Work Room into two pre-operative Holding Rooms. Scope of work involves approximately 2,415 sq. ft. New work includes non-combustible framing, 5/8" type 'X' wall cover with finish, new doors & hardware, millwork, electrical, mechanical, plumbing, sprinkler and alarms system changes for use needs and code compliance. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20108/17/20108/17/2010PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
DOC - Permit Finaled8/17/20108/17/20108/17/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection8/16/20108/17/20108/17/2010APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Aging Inspection8/16/20108/16/20108/17/2010 PASS
DetailsDave Hannah
BLD-Other6/11/20106/14/20106/15/2010APASS
DetailsDave Hannah
zack - wall cover Phone #: ###-#### ok to cover ceiling
BLD-Wall cover6/7/20106/11/20106/11/2010ACANC
DetailsDave Hannah
zack Phone #: ###-####
BLD-Framing/Rough-in5/24/20105/24/20105/24/2010PPART
DetailsDave Hannah
kelly Phone #: ###-#### ok to cover walls in first phase
BLD-Aging Inspection2/1/20102/1/20102/1/2010 PASS
DetailsDave Hannah