BLD-Final | 3/31/2010 | 4/1/2010 | 4/1/2010 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/20/2009 | 11/23/2009 | 11/23/2009 | A | PART |
Jim Sly
|
|
|
Bill phone ###-#### Wall complete except for approx 10 sq inch hole located at area above front awning. Repair and call for inspection. Architect notified.
|
BLD-Final | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | CANC |
Jim Sly
|
|
|
bill Phone #: ###-#### Re-sched.....
|
FIRE-Final Inspection | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | CANC |
Jim Sly
|
|
|
Bill ###-####
|
BLD-Final | 11/18/2009 | 11/18/2009 | 11/18/2009 | P | NR |
Jim Sly
|
|
|
bill Phone #: ###-#### Need fire final
|
BLD-Conference | 10/28/2009 | 10/29/2009 | 10/29/2009 | A | PASS |
Jim Sly
|
|
|
Inspected 2hr wall (inside Bldg) and wrapped columns..........appears OK as per approved plan. Some areas of 2hr wall located above front canopy not continuous. Showed areas of concern to Architect. Need to re-inspect after corrected.
|
BLD-Other | 10/28/2009 | 10/29/2009 | 10/28/2009 | A | CANC |
Jim Sly
|
|
|
bill - fire barrier wall Phone #: ###-####
|
BLD-Framing/Rough-in | 10/27/2009 | 10/28/2009 | 10/28/2009 | A | FAIL |
Jim Sly
|
|
|
Bill Phone #: ###-#### C/N ....Remove enough sheetrock for inspection to verify amount of layers, lapping and attachment at 2hr. wall and columns.
|