BLD-Final | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | PASS |
Dave Hannah
|
|
|
Matt@P&Z approved by telecon as no exterior changes were made. No mechanical work completed under this permit. call with any questions. thank you. Inspection requested from web by: John Lodman Phone #: ###-#### This T I will need to be finished under a new bld
|
DOC - Permit Finaled | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/18/2010 | 2/19/2010 | 2/19/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety for the vanilla shell approved.
|
FIRE-Final Inspection | 2/18/2010 | 2/18/2010 | 2/18/2010 | A | PASS |
Forrest France
|
|
|
C/N items completed.
|
FIRE-Final Inspection | 2/5/2010 | 2/8/2010 | 2/8/2010 | A | FAIL |
Forrest France
|
|
|
Noted two existing uprights blocked by adjacent plumbing drain pipe at the front east side of the tenant space. Remainder of vanilla permit work is satisfactory, final pending corrections for fire sprinkler coverage.
|