DOC - Permit Finaled | | | 10/25/2010 | | DONE |
Tisha Gallop
|
|
|
passed final insepction
|
BLD-Aging Inspection | 9/1/2010 | 9/1/2010 | 9/1/2010 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 | A | PASS |
Jim Storey
|
|
|
dave Phone #: ###-####
|
FIRE-Final Inspection | 6/28/2010 | 6/28/2010 | 6/28/2010 | P | PASS |
Forrest France
|
|
|
Noted items completed, revised fire flow data per United Water verified okay. Life safety inspection passed. Discussed adjacent project schedule.
|
FIRE-Final Inspection | 6/4/2010 | 6/4/2010 | 6/4/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide verification of the required water flow or install the fire hydrant. Also remove the thumbturn locks from both of the doors.
|
BLD-Final | 6/1/2010 | 6/3/2010 | 6/3/2010 | A | NR |
Jim Storey
|
|
|
david Phone #: ###-#### need p$z and fire final inspections.
|
FIRE-Conference | 5/12/2010 | 5/12/2010 | 5/13/2010 | P | DONE |
Forrest France
|
|
|
On site visit regarding fire lane access conditions per M. Sentenno.
|
BLD-Other | 4/14/2010 | 4/14/2010 | 4/15/2010 | A | DONE |
Forrest France
|
|
|
Contacted M. Sentenno regarding FD access provisions on site.
|
FIRE-Conference | 4/13/2010 | 4/13/2010 | 4/13/2010 | P | DONE |
Forrest France
|
|
|
On site meeting with contractor regarding fire department access, BO and FM agreement letter, and appendix D IFC 2006.
|
BLD-Energy code compliance | 3/12/2010 | 3/17/2010 | 3/17/2010 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 3/12/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Jim Storey
|
|
|
Air seal in framing inspection-Dave Phone #: ###-####
|
BLD-Foundation | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Footing | 2/4/2010 | 2/5/2010 | 2/5/2010 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|