Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD09-02094
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC13687
ePlanReviewNo
Description
Micron Building #80 (C13687) - Install AMAT Inspection - To move approximately 12 lineal feet of existing south interior partition wall and an existing 3070 door approximately 9 feet to the north. This will reduce the area of KLA Chase 106F and create an area for new equipment. New steel structure will be installed below the raised floor, attached to the concrete waffel floor, to support the new equipment. This permit also includes related electrical, mechanical, floor and ceiling grid modifications. This work is being done on the first floor of Building #80 between grid lines #5 & #6 and #F & # G. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/16/20102/18/20102/18/2010APASS
DetailsJim Storey
Inspection requested from web by: Wayne Berry Phone #: ###-####--Jim please verify if Plumbing permit was required or taked out due to valuation-Thanks
DOC - Permit Finaled2/18/20102/18/20102/18/2010PPASS
DetailsJim Storey
DOC - Permit Finaled2/18/20102/18/20102/18/2010PPASS
DetailsJim Storey
BLD-Final2/10/20102/11/20102/11/2010ANR
DetailsJim Storey
2 of 2 for Thursday Inspection requested from web by: Wayne Berry Phone #: ###-#### need to resolve plm permit and sign off.
FIRE-Final Inspection2/9/20102/10/20102/10/2010PPASS
DetailsForrest France
Fire life safety finaled.