Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD09-02104
StatusFinaled
Name BUCKLE
Site Address 350 N MILWAUKEE AVE Unit: 1089
Project NameBTS - #1089
Customer Number 
ePlanReviewNo
Description
(BUCKLE - BOISE TOWNE SQUARE - SPACE 1089) To remodel an existing 4,829 square foot retail tenant space for a new retail tenant. Work to include: [installation of interior non-bearing partition walls to create, a stockroom, a sales area, 8 fitting rooms, separate sex accessible restrooms, an office, and an exiting hallway], installation of new flooring throughout, construction of a new storefront system, installation of suspended ceiling system per CISCA 0-2, installation of suspended gypsum board ceiling, new lighting, new ducts and diffusers, and interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. Any racks installed that exceed 8 ft. in height require a separate permit. MALL STOREFRONT SIGNAGE REQUIRES A SEPARATE PERMIT. **TLW** 6-8-10 FINAL CERT OF VALUE PER GC $ 248,155.00 ///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/22/20104/22/20104/22/2010PPASS
DetailsMike Jordan
Andy Phone #: ###-####. ok for perm occ.
BLD-Final4/20/20104/21/20104/21/2010APART
DetailsMike Jordan
Andy Phone #: ###-####. Need RFI from enginner of record approving modifications to roll up gate framing. Everytrhing else ok.
FIRE-Final Inspection4/20/20104/21/20104/21/2010APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection4/20/20104/20/20104/20/2010PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Alarm Testing4/20/20104/20/20104/20/2010PPASS
DetailsTroy Cobbley
The smoke evacuation system functioned correctly.
BLD-Framing/Rough-in4/9/20104/12/20104/12/2010PPASS
DetailsMike Jordan
ceiling\\late PM Phone #: ###-####
BLD-Framing/Rough-in3/17/20103/18/20103/18/2010APASS
DetailsMike Jordan
andy Phone #: ###-####. Framing at storefront and harlid areas ok. Structure for roll up gate not per aproved plans. Will need RFI from engineer for acceptance before occupancy.
BLD-Framing/Rough-in3/16/20103/17/20103/17/2010PNR
DetailsMike Jordan
As late as possible-Andy Steel stud framing inspection Phone #: ###-####. Needs elec and fire sprinkler rough in inspections.
BLD-Framing/Rough-in3/10/20103/11/20103/11/2010PPASS
DetailsMike Jordan
Andy-Come in loading area #3 between Dillards & Sears bottom floor Phone #: ###-####. Interior framed walls and hardlids only.