Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD09-02227
StatusFinaled
Name CM COMPANY
Site Address 805 W FRANKLIN ST
Project NameFRANKLIN PLAZA BUILDING
Customer Number 
ePlanReviewNo
Description
(CRADLEPOINTE T.I., 1ST FLOOR) TCO FOR THIS TENANT UNTIL SCOPE OF UPGRADE AGREEMENT W/ BLD09-02173 IS FINALED. This building is fully sprinklered as substitution for 1-hour construction. Scope of work includes select interior demolition as per plans; construction of new interior walls to create one accessible mens shower and one accessible womens shower in a common locker room; new work rooms and modify south exit door to create double door with one leaf to provide minimum 32" clear and second leaf of lessor width to accomodate moving of equipment and supplies into and out of the receiving area. Modify electrical, mechanical, plumbing, sprinkler & alarm systems. NOTE: Separate applications, plans and permits are required before any modification of sprinkler system or alarm system can be done, all as regulated by Fire Dept. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/15/20112/15/20112/16/2011APASS
DetailsTony Young
investigate shower rooms?,, built or not.. NOT BUILT,, ok to final out..
BLD-Final2/14/20112/14/20112/16/2011PPART
DetailsTony Young
Tony//scheduled by Ron Hill Phone #: ###-#### (note: need plumbing permit for shower rooms?),, they elected not to do the shower rooms at this point
Extend Permit 90/180 days 12/22/201012/22/2010 DONE
extend 90 days per Jason Blais
BLD-Aging Inspection9/23/20109/23/20109/23/2010 PEND
DetailsTony Young
BLD-Final6/21/20106/22/20106/22/2010APASS
DetailsTony Young
Dan Phone #: ###-####
FIRE-Final Inspection6/21/20106/21/20106/22/2010PPASS
DetailsForrest France
Inspection passed, fire life safety finaled.
BLD-Aging Inspection6/3/20106/3/20106/7/2010 PEND
DetailsTony Young
FIRE-Conference3/4/20103/4/20103/4/2010PDONE
DetailsForrest France
Regarding project related FIR10-00091 pipe materials.
FIRE-Conference2/24/20102/25/20102/25/2010ADONE
DetailsForrest France
On site conferecne regarding fire sprinkler protection at the relocated radio test room and conditions per IFC 2006 903.3.1.1.1.
BLD-Framing/Rough-in2/2/20102/3/20102/3/2010APART
DetailsTony Young
Dan Phone #: ###-####
columns (2),, fire rating 1 hr,, ok per plan
BLD-Framing/Rough-in1/26/20101/26/20101/26/2010PPASS
DetailsMike Jordan
Interior steel stud framed walls, 1st. floor ok.