BLD-Final | 10/1/2010 | 10/1/2010 | 10/1/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/8/2010 | 9/8/2010 | 9/8/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Jim Storey
|
|
|
3dr lift 9:30 am
|
BLD-Other | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Jim Storey
|
|
|
2nd grout lift. 1:00
|
BLD-Concrete | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PASS |
Jim Storey
|
|
|
8:30 grout pour appt. 1st litft ok
|
BLD-Other | 6/30/2010 | 6/30/2010 | 6/30/2010 | A | PASS |
Jim Storey
|
|
|
rebar ok
|
BLD-Other | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Jim Storey
|
|
|
handrail c/n made ok
|
BLD-Final | 5/3/2010 | 5/3/2010 | 5/3/2010 | A | PART |
Jim Storey
|
|
|
temp ok
|
FIRE-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
BLD-Final | 4/21/2010 | 4/23/2010 | 4/23/2010 | A | PART |
Jim Storey
|
|
|
c/n handrail on wall west exit stair.
|
BLD-Conference | 4/19/2010 | 4/20/2010 | 4/21/2010 | A | CANC |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PART |
Forrest France
|
|
|
Automatic fire door tested okay per NFPA 80, EM lights and exit signs approved, project related sprinkler permit finaled, door hardware is satisfactory. Final pending project attatched fire alarm permit work- note; ID detector, SD, and horn passed functional test.
|
FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | DONE |
Forrest France
|
|
|
Regarding fire code review note items including IFC 4004.1.6, fire alarm/sprinkler permits, and door hardware requirements for H occupancies.
|
BLD-Wall cover | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Jim Storey
|
|
|
first layer of rated wall interior.
|
BLD-Framing/Rough-in | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Jim Storey
|
|
|
reviewed damper installation listing ok to cover.
|
BLD-Conference | 3/10/2010 | 3/10/2010 | 3/10/2010 | A | PART |
Jim Storey
|
|
|
wrong listing for damper assembly/ got corect info. in the submital process for insp.
|
BLD-Framing/Rough-in | 3/9/2010 | 3/9/2010 | 3/9/2010 | P | NR |
Jim Storey
|
|
|
pending listing instaltion guide for damper in ratted wall.
|
BLD-Wall cover | 3/8/2010 | 3/8/2010 | 3/8/2010 | A | CANC |
Jim Storey
|
|
|
first layer of gyp for septration wall. 12:00 am appt.301 1 st layer ok to cover/ talked to contractor to cordenate with mech contractor to provide listing and mech insp with myself to insp. framing.
|
BLD-Framing/Rough-in | 3/5/2010 | 3/5/2010 | 3/5/2010 | A | PART |
Jim Storey
|
|
|
re-insp.all but roof sheathing at old dock 6 oc screw sch is pending.
|
BLD-Framing/Rough-in | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | FAIL |
Jim Storey
|
|
|
roof dyaphram not compley under overbuild/ missing screw pattern roof and sheer walls. reviewed 1 hr top of wall requirments.
|
BLD-Wall cover | 2/22/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Jim Storey
|
|
|
9:00 am appointment cmu walls. top out ok.
|
BLD-Wall cover | 2/22/2010 | 2/24/2010 | 2/24/2010 | A | CANC |
Jim Storey
|
|
|
9:00 am appointment cmu walls. rained out
|
BLD-Wall cover | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | PASS |
Jim Storey
|
|
|
cmu chem bld. 2 nd lift 1:30 appt.
|
BLD-Wall cover | 2/22/2010 | 2/23/2010 | 2/23/2010 | A | PASS |
Jim Storey
|
|
|
9:00 am appointment cmu walls. first lift cmu and rebar ok si on site.
|
BLD-Foundation | 2/16/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Jim Storey
|
|
|
9:00 appt.exterior tank storage wall rebar and containment height ok.
|
BLD-Concrete | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Jim Storey
|
|
|
3:00 appt exterior tank pads at chem storage exterior area west of loading dock ok.
|
BLD-Foundation | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Jim Storey
|
|
|
chem wall and containment
|
BLD-Footing | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Jim Storey
|
|
|
ft ok chem.
|
BLD-Footing | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Jim Storey
|
|
|
office restrooms framing ok
|