BLD-Final | 5/25/2010 | 5/25/2010 | 5/25/2010 | P | PASS |
Tom Arcoraci
|
|
|
Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Final | 5/18/2010 | 5/19/2010 | 5/19/2010 | P | NR |
Tom Arcoraci
|
|
|
please call me ahead of time so I can meet you. looking to final units B and C only so I can get temp CofO''s for closing.
thanks Inspection requested from web by: Tony Luchini Phone #: ###-####
|
FIRE-Final Inspection | 5/18/2010 | 5/19/2010 | 5/19/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Energy code compliance | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Tom Arcoraci
|
|
|
insulation inspection for west side. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Framing/Rough-in | 4/6/2010 | 4/7/2010 | 4/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
framing inspection on all 4 units please. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2010 | 4/7/2010 | 4/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
energy inspection on east side only. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Framing/Rough-in | 3/31/2010 | 4/1/2010 | 4/1/2010 | P | FAIL |
Tom Arcoraci
|
|
|
framing inspection for units B and C only (east side). Inspection requested from web by: Tony Luchini Phone #: ###-#### energy code required u 28 windows ???? vertical fire blocks required in double walls
|
BLD-Conference | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PART |
Tom Arcoraci
|
|
|
two hour wall conf with elec contractor
|
BLD-Wall cover | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PART |
Tom Arcoraci
|
|
|
shear wall inspection prior to siding. please speak with framer, Josh.
thanks Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Conference | 2/16/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Tom Arcoraci
|
|
|
I''d like to meet to review fire walls and truss design. Inspection requested from web by: Tony Luchini Phone #: ###-####
|