BLD-Final | 5/26/2010 | 5/28/2010 | 5/28/2010 | A | PASS |
Jim Storey
|
|
|
Jim; Forest recently completed the life safety final for this Buidling- Riverview. I''d like to combine with another final at the main Supervalu Bldg. Please let me know atime Friday that works in your schedule so I can be ther. Thanks Craig Inspection requested from web by: Craig Brown Phone #: ###-####
|
DOC - Permit Finaled | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 5/19/2010 | 5/19/2010 | 5/20/2010 | P | PASS |
Forrest France
|
|
|
Correction items finished, fire life safety finaled.
|
FIRE-Final Inspection | 5/14/2010 | 5/17/2010 | 5/17/2010 | P | FAIL |
Troy Cobbley
|
|
|
I called and left message on Craig's voice mail on the way and call when I arrived at the site. I asked for him with the security lady at the front deck but did not make contact. I noted that the exit sensor at the main exit has been disabled with a sign posted that says you must use your badge to exit the facility. No inspection was performed.
|
FIRE-Final Inspection | 4/16/2010 | 4/16/2010 | 4/16/2010 | A | FAIL |
Forrest France
|
|
|
Access control doors are not in compliance with the functional aspects of item #3 per IFC 1008.1.3.4- Push to exit button must interrupt power for 30 sec. upon activation.
|
FIRE-Alarm Testing | 4/15/2010 | 4/15/2010 | 4/15/2010 | A | PART |
Forrest France
|
|
|
Relays at access control mag locks at both the south and west exits tested satisfactory for compliance with IFC 2006 sec. 1008.1.3.4 item #4.
|
FIRE-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | A | PART |
Forrest France
|
|
|
Final pending fire alarm permit work for relays at the main entry/exit door mag locks to release upon alarm per IFC requirements.
|
FIRE-Conference | 2/24/2010 | 2/24/2010 | 2/24/2010 | P | DONE |
Forrest France
|
|
|
Regarding IFC 2006 sec. 1008.1.3.4 criteria for access controlled egress doors items #1 thru 6.
|
BLD-Wall cover | 1/28/2010 | 1/28/2010 | 1/28/2010 | P | PASS |
Jim Storey
|
|
|
rated wall and above ceilling ok/ ok to cover framing.
|
BLD-Conference | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PART |
Jim Storey
|
|
|
need to maintane rated loby wall above ceilling/ ok to rock rated infil. pending trades
|