Description
(ST. LUKE'S - REFERENCE LABORATORY) Plan Modification Additional Plans - 10/12/10 - Due to mold mitigation and abatement, new windows and exterior wall finish & sheathing are being added to scope of work as approved under Modification of DRH09-00259. New exterior envelope components to comply with 2006 IECC. PLAN MODIFICATION 9/10/10 - SCOPE OF WORK REDUCED DUE TO FINANCIAL CONSTRAINTS. EXTERIOR MODIFICATIONS AND CANOPY ADDITIONS DELETED; INTERIOR FINISHES WITHIN ROOMS MARKED "FUTURE" TO REMAIN AS-IS; INTERIOR RESTROOM FINISHES & DIVIDERS TO REMAIN UNCHANGED; MISCELLANEOUS ARCH., MECH., ELECT., MINOR CHANGES OR SUBSTITUTIONS FOR COST SAVINGS. ALL ORIGINAL PLAN REVIEW COMMENTS OF ALL AGENCIES FOR ITEMS NOT REMOVED FROM SCOPE OF WORK ARE STILL APPLICABLE. ALL EXITING SYSTEM COMPONENTS (DOOR WIDTH, HARDWARE, CLEAR FLOOR SPACE, DOOR SWING, EXIT LIGHTING AND EMERGENCY LIGHTING, ETC. SHALL BE COMPLIANT WITH CURRENT CODE FOR LIFE SAFETY / EGRESS. To remodel an existing two story 31,625 sq. ft. building into a medical laboratory per approved plans. Demolition work is under separate permit, BLD09-02080. Work to include construction of interior walls in conjunction with remaining existing walls to create office, work, laboratory and support areas; conference / training room on second floor with existing offices; upgrade restrooms, showers, drinking fountains, doors, door hardware and clear floor spaces & latch side clearance at all doors; work on electrical, mechanical, plumbing, sprinkler, alarm and security systems to comply with current adopted codes and ordinances. Separate applications and permits required for sprinkler & alarm system modifications as regulated by the fire department, before being worked on. NOTE: This building is fully fire sprinklered with all heads being changed to quick response to allow non-rated corridors. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20115/18/20115/18/2011APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble
BLD-Aging Inspection3/23/20113/23/20113/23/2011 PASS
DetailsJim Storey
temp final ok pending p$z pw .
BLD-Final1/21/20111/21/20111/21/2011PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble temp final ok pending p$z pw .
FIRE-Final Inspection1/21/20111/21/20111/21/2011PPASS
DetailsForrest France
Fire life safety passed with the exception of door hardware at one location first floor to be switched operable under any condition in the direction of egress. Combustible decking at the roof to be removed entirely as agreed to remain in compliance with NFPA 13 requirements as discussed and agreed with general contractors on site.
BLD-Final1/19/20111/19/20111/21/2011PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble pending fire.
FIRE-Conference12/23/201012/23/201012/23/2010ADONE
DetailsForrest France
Regarding project related FIR permit work.
BLD-Wall cover11/24/201011/24/201011/24/2010APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble ceiling grid ok to cover but needs to fire proof around 1hr wall above ceiling phil will get this work done and schedule an inspection
BLD-Wall cover11/10/201011/10/201011/10/2010PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by phil doble. Ceiling grid inspection, 2nd floor only at interior rooms, all other grid existing.
BLD-Framing/Rough-in10/25/201010/25/201010/25/2010APASS
DetailsJim Storey
hard lid framing ok cooller area ok to instal cooller
BLD-Wall cover9/7/20109/7/20109/7/2010APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble 2nd phase north side ok to cover/ gas storage ok.
BLD-Wall cover8/19/20108/19/20108/19/2010PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble up stairs ok to cover walls all area in main to the south ok to cover walls.
BLD-Other7/16/20107/19/20107/19/2010APASS
DetailsJim Storey
work in progress.
BLD-Aging Inspection7/14/20107/14/20107/16/2010 PASS
DetailsJim Storey
work in progress.