BLD-Final | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | PASS |
Dave Hannah
|
|
|
Call Braxton to meet inspector on site. Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
|
BLD-Final | 3/2/2011 | 3/4/2011 | 3/7/2011 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by brandon waltman ok for temp occ ok for perm occ after ada lift for pool is on site
|
BLD-Wall cover | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by brandon waltman sheer wall in mec room bathroon and blocking iat top of trusses
|
BLD-Conference | 1/27/2011 | 1/28/2011 | 1/28/2011 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by brandon waltman went over new plans
|
BLD-Aging Inspection | 1/20/2011 | 1/20/2011 | 1/25/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/8/2010 | 11/8/2010 | 11/9/2010 | | FAIL |
Dave Hannah
|
|
|
up to zoning
|
FIRE-Final Inspection | 9/3/2010 | 9/7/2010 | 9/10/2010 | A | PASS |
Forrest France
|
|
|
Life safety passed, door hardware at the main entry to be installed prior to structural final as discussed.
|
BLD-Final | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | NR |
Dave Hannah
|
|
|
john Phone #: ###-#### needs fire zoning finals and to resubmit plans
|
BLD-Energy code compliance | 7/7/2010 | 7/8/2010 | 7/7/2010 | A | PASS |
Dave Hannah
|
|
|
Inspection requested from web by: John Cloninger
|
BLD-Energy code compliance | 7/6/2010 | 7/7/2010 | 7/7/2010 | P | PASS |
Dave Hannah
|
|
|
Inspection requested from web by: John Cloninger
|
BLD-Framing/Rough-in | 7/7/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Dave Hannah
|
|
|
Inspection requested from web by: John Cloninger
|
BLD-Framing/Rough-in | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Dave Hannah
|
|
|
Inspection requested from web by: John Cloninger trusses are ok ok to insulate ceiling
|
BLD-Framing/Rough-in | 7/6/2010 | 7/6/2010 | 7/7/2010 | A | PART |
Dave Hannah
|
|
|
Inspection requested from web by: John Cloninger walls ok but need to look at truss enginering
|
BLD-Framing/Rough-in | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### shear walls
|
BLD-Other | 6/23/2010 | 6/23/2010 | 6/23/2010 | P | CANC |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Dave Hannah
|
|
|
Ike ###-####
|
BLD-Footing | 5/5/2010 | 5/5/2010 | 5/6/2010 | P | PART |
Dave Hannah
|
|
|
early pm as possible// John ###-#### contractor has spec inspection on site to inspect rebar and test concrerte
|