Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD10-00079
StatusFinaled
Name BRIGHTON HOMES LLC
Site Address 3960 S GLOBE THEATRE AVE
Project NameRiver Heights Community Center
Customer Number 
ePlanReviewNo
Description
River Heights Community Center - To construct a new 3,325 square foot, one story, wood framed subdivision community center with a 200 square foot, wood trellis entry cover. This permit also includes related site improvements. This building contains a multi-purpose gathering room, a fitness room, large entry foyer, accessible restrooms and storage and utility rooms. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/14/20114/15/20114/15/2011APASS
DetailsDave Hannah
Call Braxton to meet inspector on site. Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD-Final3/2/20113/4/20113/7/2011APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman ok for temp occ ok for perm occ after ada lift for pool is on site
BLD-Wall cover2/22/20112/22/20112/22/2011PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman sheer wall in mec room bathroon and blocking iat top of trusses
BLD-Conference1/27/20111/28/20111/28/2011PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman went over new plans
BLD-Aging Inspection1/20/20111/20/20111/25/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection11/8/201011/8/201011/9/2010 FAIL
DetailsDave Hannah
up to zoning
FIRE-Final Inspection9/3/20109/7/20109/10/2010APASS
DetailsForrest France
Life safety passed, door hardware at the main entry to be installed prior to structural final as discussed.
BLD-Final9/3/20109/7/20109/7/2010ANR
DetailsDave Hannah
john Phone #: ###-#### needs fire zoning finals and to resubmit plans
BLD-Energy code compliance7/7/20107/8/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Energy code compliance7/6/20107/7/20107/7/2010PPASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Framing/Rough-in7/7/20107/7/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Framing/Rough-in7/6/20107/7/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger trusses are ok ok to insulate ceiling
BLD-Framing/Rough-in7/6/20107/6/20107/7/2010APART
DetailsDave Hannah
Inspection requested from web by: John Cloninger walls ok but need to look at truss enginering
BLD-Framing/Rough-in6/23/20106/24/20106/24/2010APASS
DetailsDave Hannah
John Phone #: ###-#### shear walls
BLD-Other6/23/20106/23/20106/23/2010PCANC
DetailsDave Hannah
John Phone #: ###-####
BLD-Foundation5/7/20105/7/20105/7/2010PPASS
DetailsDave Hannah
Ike ###-####
BLD-Footing5/5/20105/5/20105/6/2010PPART
DetailsDave Hannah
early pm as possible// John ###-#### contractor has spec inspection on site to inspect rebar and test concrerte