BLD-Final | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Jim Sly
|
|
|
clair Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 | A | PASS |
Jim Sly
|
|
|
inspection for lift//Clair Phone #: ###-#### I had them add extra floor joists at area directly below new Wheelchair lift.......OK.
|
BLD-Conference | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | DONE |
Jim Sly
|
|
|
Clair Bowman ###-####
|
FIRE-Supply Line Cover | 1/31/2011 | 1/31/2011 | 1/31/2011 | P | PART |
Forrest France
|
|
|
inspection of cement soffit board on new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy NOTE: Verified hardy board install by contractor- "410".
|
FIRE-Sprinkler Rough-in | 1/27/2011 | 1/27/2011 | 1/28/2011 | P | PART |
Tim Frost
|
|
|
This inspection was called in under the wrong permit. The permit should have been FIR10-00072.
The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board.
|
FIRE-Conference | 12/30/2010 | 12/30/2010 | 1/3/2011 | A | DONE |
Troy Cobbley
|
|
|
Does 8.15.7.3 apply to small extension of the new front entrance as suggested by fire sprinkler subcontractor Information was forwarded to Tim Frost who agreed this section of code could be applied but the combustible spaces would either have to have sprinkler protection or be filled with non combustible insulation.
|
BLD-Final | 12/9/2010 | 12/9/2010 | 12/10/2010 | P | PART |
Jim Sly
|
|
|
door is being manufactured this morning due by 11 Phone #: ###-#### >> Inspection requested via web by John McCarthy Rated door is installed and OK.....OK for Temp Occ. Reason for Temp Occ explained on previous inspection and notes. Add Mech (temp occ.) on that list.
|
BLD-Final | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | NR |
Jim Sly
|
|
|
single action levers for remaining doors requested by Fire will arrive first thing this morning will be installed for pm inspection - I will call late morning with an update Phone #: ###-#### >> Inspection requested via web by John McCarthy Need Rated door at riser room to be tagged. Can only give Temp occ when door completed. Mech Temp....Zoning Temp......Fire life Temp (Need wheelchair lift installed and front entry canopy done) Fire sprinkler Temp (Need sprinkler head in canopy at front entry)
|
FIRE-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
|
BLD-Final | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | CANC |
Jim Sly
|
|
|
Pending Fire and Fire Life Safety Phone #: ###-#### >> Inspection requested via web by John McCarthy Not Ready.....
|
FIRE-Final Inspection | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | FAIL |
Troy Cobbley
|
|
|
Remove all thumbturn locks and provide single action hardware, install all panic hardware as shown, provide signage on doors 30 aand 31, provide fire extinguishers as discussed, provide one hour rating for the fire riser room, mount the address numbers, provide and mount the occupant load signs, provide exit sign/emergency light/exit discharge lights as per plan, verfiy the change in door hardware with Carl for doors 14 and 21.
|
BLD-Final | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | NR |
Jim Sly
|
|
|
Sub inspections and zoning are set for this morning Phone #: ###-#### >> Inspection requested via web by John McCarthy Need all required finals........
|
FIRE-Final Inspection | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | CANC |
Troy Cobbley
|
|
|
The life safety inspection was unable to happen today due to the project related fire alarm and fire sprinkler permits still being unable to pass final inspection when I was at the job site at 8:30 this morning. When I arrived for a second visit at 11:15 I met building inspector Jim Sly. We met with John the architect and went over the outstanding fire alarm and fire sprinkler items and some of the obvious life safety items such as missing panic hardware, exit light at the main door and the wheelchair lift for the stage. John is going to try to have everything wrapped up for a re-inspection for monday morning.
|
BLD-Final | 12/2/2010 | 12/2/2010 | 12/2/2010 | P | CANC |
Jim Sly
|
|
|
Sub inspections underway - electrical set for this afternoon - Due to lift a temporary is what is requested. Phone #: ###-#### >> Inspection requested via web by John McCarthy Cancelled by Contr..... NR
|
FIRE-Conference | 12/1/2010 | 12/1/2010 | 12/1/2010 | A | CANC |
Troy Cobbley
|
|
|
Don and I met over the knox box location which I deferred to the local responding station and we discussed the combustible concealed space requirements for the areas below the stage and the sound booth. Both areas need to be filled with insulation to the bottom of the floor joists.
|
BLD-Conference | 11/30/2010 | 11/30/2010 | 11/30/2010 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by John McCarthy Talked about handrails at stage.
|
BLD-Conference | 11/22/2010 | 11/22/2010 | 11/22/2010 | A | DONE |
Jim Sly
|
|
|
Conference for pending items for TCO Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Conference | 11/17/2010 | 11/17/2010 | 11/17/2010 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 11/17/2010 | 11/17/2010 | 11/17/2010 | A | CANC |
Jim Sly
|
|
|
|
BLD-Concrete | 10/13/2010 | 10/14/2010 | 10/14/2010 | A | CANC |
Jim Sly
|
|
|
|
BLD-Footing | 10/14/2010 | 10/14/2010 | 10/14/2010 | A | PASS |
Jim Sly
|
|
|
footing and stemwall inspection front entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Foundation | 10/13/2010 | 10/13/2010 | 10/13/2010 | A | CANC |
Jim Sly
|
|
|
Footing and stem wall inspection for new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy Re-sched......
|
BLD-Conference | 9/29/2010 | 9/29/2010 | 9/29/2010 | P | DONE |
Jim Sly
|
|
|
C/N Need to resubmit for plan modification because of changes to stage area. Approved plans must be on site prior to proceeding work on stage.
|
BLD-Conference | 9/29/2010 | 9/29/2010 | 9/29/2010 | P | CANC |
|
|
|
Inspection cancelled from web by: Patricia Smith
|
BLD-Wall cover | 9/13/2010 | 9/13/2010 | 9/13/2010 | A | PART |
Jim Sly
|
|
|
inspection for shear on north and south walls of the sanctuary. Phone #: ###-#### >> Inspection requested via web by John McCarthy (2) East/West shear walls.......OK.
|
BLD-Wall cover | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | CANC |
Jim Sly
|
|
|
Inspection for shear on north and south walls Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Wall cover | 9/9/2010 | 9/9/2010 | 9/9/2010 | A | PART |
Jim Sly
|
|
|
Insulation board inspection for cover on east and north sides Phone #: ###-#### >> Inspection requested via web by John McCarthy Insul for areas listed above.....OK
|
BLD-Wall cover | 9/3/2010 | 9/3/2010 | 9/3/2010 | P | PART |
Jim Sly
|
|
|
Inspection for sheer walls in corridors in order cover corridor walls and ceilings including classroom and restroom walls and ceilings Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
FIRE-Supply Line Cover | 8/25/2010 | 8/25/2010 | 8/25/2010 | A | CANC |
Troy Cobbley
|
|
|
This inspection is for a sprinkler cover. No entry is being made under this building permit. The entry will be made under the correct fire sprinkler permit.
|
FIRE-Supply Line Cover | 8/24/2010 | 8/24/2010 | 8/24/2010 | P | FAIL |
Troy Cobbley
|
|
|
I spoke to John McCarthy about the requirement for the entire space to be filled with insulation to meet NFPA 13 requirements
|
BLD-Framing/Rough-in | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PART |
Jim Sly
|
|
|
Inspection for clerestory trusses and upper walls in order to insulate Phone #: ###-#### >> Inspection requested via web by John McCarthy OK to insuate truss area at uppermost roof.
|
BLD-Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | CANC |
Jim Sly
|
|
|
Bill phone...
|
FIRE-Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 | A | DONE |
Troy Cobbley
|
|
|
Talked about relocation of planned exposed fire sprinkler lines in order to have them concealed. These changes need to be submitted to tim frost for approval. Also we discussed the combustible concealed space. There are two basic options which are fill the space entirely with non-combustible insulation or provide sprinkler protection. Also the fire sprinkler riser needs to be relocated out of the access door way to the riser room.
|
BLD-Conference | 8/4/2010 | 8/5/2010 | 8/4/2010 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Framing/Rough-in | 8/4/2010 | 8/4/2010 | 8/4/2010 | A | PART |
Jim Sly
|
|
|
Inspection of roof sheeting Phone #: ###-#### >> Inspection requested via web by John McCarthy Roof sheathing nailing OK.
|
BLD-Footing | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Jim Sly
|
|
|
John - Inspection for two footings added to existing pony wall footings - MTI is scheduled for 10:30 for epoxy rebar Phone #: ###-#### >> Inspection requested via web by John McCarthy OK Pending MTI approval.
|