Permit Information
Permit NumberBLD10-00114
StatusFinaled
Name CENTER FOR SPIRITUAL LIVING
Site Address 10464 W GARVERDALE CT
Project NameCENTER FOR SPIRITUAL LIVING
Customer Number 
ePlanReviewNo
Description
(CENTER FOR SPIRITUAL LIVING) (11-18-10 PLAN MODIFICATION TO EXTEND THE ROOF AND WALL STRUCTURE AT THE MAIN ENTRANCE, PROVIDE A WHEELCHAIR LIFT IN LIEU OF A RAMP TO SERVE THE PLATFORM, INCREASE THE HEIGHT OF THE PLATFORM TO 21 INCHES, INCREASE THE SIZE OF THE PRAYER ROOM AND THE BACKSTAGE AREA, AND TO RECONFIGURE THE PLATFORM.) This building will be fully fire sprinklered for the occupant load in the fire area. To convert an existing 7,108 square foot office building (B Occupancy) to a church (A-3 Occupancy). Nonstructural work includes 2 restrooms accessible to the disabled, a wheelchair lift accessible to the disabled, interior nonbearing walls, interior doors, interior windows, exterior windows, and finishes. Structural work includes a new roof structure, bearing walls, beams, columns, headers, shear walls, joists, concrete footings, etc. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and standards. The new fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Interior nonstructural demolition was done under permit BLD10-00038. Planning approvals done under CUP09-00054, DRH09-00208, & DRH09-00281. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/3/20116/3/20116/3/2011PPASS
DetailsJim Sly
clair Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection4/29/20114/29/20114/29/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in3/15/20113/16/20113/16/2011APASS
DetailsJim Sly
inspection for lift//Clair Phone #: ###-####
I had them add extra floor joists at area directly below new Wheelchair lift.......OK.
BLD-Conference3/10/20113/11/20113/11/2011ADONE
DetailsJim Sly
Clair Bowman ###-####
FIRE-Supply Line Cover1/31/20111/31/20111/31/2011PPART
DetailsForrest France
inspection of cement soffit board on new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy NOTE: Verified hardy board install by contractor- "410".
FIRE-Sprinkler Rough-in1/27/20111/27/20111/28/2011PPART
DetailsTim Frost
This inspection was called in under the wrong permit. The permit should have been FIR10-00072.

The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board.
FIRE-Conference12/30/201012/30/20101/3/2011ADONE
DetailsTroy Cobbley
Does 8.15.7.3 apply to small extension of the new front entrance as suggested by fire sprinkler subcontractor
Information was forwarded to Tim Frost who agreed this section of code could be applied but the combustible spaces would either have to have sprinkler protection or be filled with non combustible insulation.
BLD-Final12/9/201012/9/201012/10/2010PPART
DetailsJim Sly
door is being manufactured this morning due by 11 Phone #: ###-#### >> Inspection requested via web by John McCarthy
Rated door is installed and OK.....OK for Temp Occ. Reason for Temp Occ explained on previous inspection and notes. Add Mech (temp occ.) on that list.
BLD-Final12/8/201012/8/201012/8/2010PNR
DetailsJim Sly
single action levers for remaining doors requested by Fire will arrive first thing this morning will be installed for pm inspection - I will call late morning with an update Phone #: ###-#### >> Inspection requested via web by John McCarthy
Need Rated door at riser room to be tagged. Can only give Temp occ when door completed. Mech Temp....Zoning Temp......Fire life Temp (Need wheelchair lift installed and front entry canopy done) Fire sprinkler Temp (Need sprinkler head in canopy at front entry)
FIRE-Final Inspection12/8/201012/8/201012/8/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
BLD-Final12/6/201012/6/201012/6/2010PCANC
DetailsJim Sly
Pending Fire and Fire Life Safety Phone #: ###-#### >> Inspection requested via web by John McCarthy
Not Ready.....
FIRE-Final Inspection12/6/201012/6/201012/6/2010PFAIL
DetailsTroy Cobbley
Remove all thumbturn locks and provide single action hardware, install all panic hardware as shown, provide signage on doors 30 aand 31, provide fire extinguishers as discussed, provide one hour rating for the fire riser room, mount the address numbers, provide and mount the occupant load signs, provide exit sign/emergency light/exit discharge lights as per plan, verfiy the change in door hardware with Carl for doors 14 and 21.
BLD-Final12/3/201012/3/201012/3/2010PNR
DetailsJim Sly
Sub inspections and zoning are set for this morning Phone #: ###-#### >> Inspection requested via web by John McCarthy
Need all required finals........
FIRE-Final Inspection12/3/201012/3/201012/3/2010PCANC
DetailsTroy Cobbley
The life safety inspection was unable to happen today due to the project related fire alarm and fire sprinkler permits still being unable to pass final inspection when I was at the job site at 8:30 this morning. When I arrived for a second visit at 11:15 I met building inspector Jim Sly. We met with John the architect and went over the outstanding fire alarm and fire sprinkler items and some of the obvious life safety items such as missing panic hardware, exit light at the main door and the wheelchair lift for the stage. John is going to try to have everything wrapped up for a re-inspection for monday morning.
BLD-Final12/2/201012/2/201012/2/2010PCANC
DetailsJim Sly
Sub inspections underway - electrical set for this afternoon - Due to lift a temporary is what is requested. Phone #: ###-#### >> Inspection requested via web by
John McCarthy
Cancelled by Contr..... NR
FIRE-Conference12/1/201012/1/201012/1/2010ACANC
DetailsTroy Cobbley
Don and I met over the knox box location which I deferred to the local responding station and we discussed the combustible concealed space requirements for the areas below the stage and the sound booth. Both areas need to be filled with insulation to the bottom of the floor joists.
BLD-Conference11/30/201011/30/201011/30/2010ADONE
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by John McCarthy
Talked about handrails at stage.
BLD-Conference11/22/201011/22/201011/22/2010ADONE
DetailsJim Sly
Conference for pending items for TCO Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Conference11/17/201011/17/201011/17/2010PCANC
DetailsJim Sly
BLD-Conference11/17/201011/17/201011/17/2010ACANC
DetailsJim Sly
BLD-Concrete10/13/201010/14/201010/14/2010ACANC
DetailsJim Sly
BLD-Footing10/14/201010/14/201010/14/2010APASS
DetailsJim Sly
footing and stemwall inspection front entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Foundation10/13/201010/13/201010/13/2010ACANC
DetailsJim Sly
Footing and stem wall inspection for new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy Re-sched......
BLD-Conference9/29/20109/29/20109/29/2010PDONE
DetailsJim Sly
C/N Need to resubmit for plan modification because of changes to stage area. Approved plans must be on site prior to proceeding work on stage.
BLD-Conference9/29/20109/29/20109/29/2010PCANC
Details
Inspection cancelled from web by: Patricia Smith
BLD-Wall cover9/13/20109/13/20109/13/2010APART
DetailsJim Sly
inspection for shear on north and south walls of the sanctuary. Phone #: ###-#### >> Inspection requested via web by John McCarthy
(2) East/West shear walls.......OK.
BLD-Wall cover9/10/20109/10/20109/10/2010PCANC
DetailsJim Sly
Inspection for shear on north and south walls Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Wall cover9/9/20109/9/20109/9/2010APART
DetailsJim Sly
Insulation board inspection for cover on east and north sides Phone #: ###-#### >> Inspection requested via web by John McCarthy Insul for areas listed above.....OK
BLD-Wall cover9/3/20109/3/20109/3/2010PPART
DetailsJim Sly
Inspection for sheer walls in corridors in order cover corridor walls and ceilings including classroom and restroom walls and ceilings
Phone #: ###-#### >> Inspection requested via web by John McCarthy
FIRE-Supply Line Cover8/25/20108/25/20108/25/2010ACANC
DetailsTroy Cobbley
This inspection is for a sprinkler cover. No entry is being made under this building permit. The entry will be made under the correct fire sprinkler permit.
FIRE-Supply Line Cover8/24/20108/24/20108/24/2010PFAIL
DetailsTroy Cobbley
I spoke to John McCarthy about the requirement for the entire space to be filled with insulation to meet NFPA 13 requirements
BLD-Framing/Rough-in8/20/20108/20/20108/20/2010PPART
DetailsJim Sly
Inspection for clerestory trusses and upper walls in order to insulate Phone #: ###-#### >> Inspection requested via web by John McCarthy
OK to insuate truss area at uppermost roof.
BLD-Conference8/4/20108/4/20108/4/2010PCANC
DetailsJim Sly
Bill phone...
FIRE-Conference8/4/20108/4/20108/4/2010ADONE
DetailsTroy Cobbley
Talked about relocation of planned exposed fire sprinkler lines in order to have them concealed. These changes need to be submitted to tim frost for approval. Also we discussed the combustible concealed space. There are two basic options which are fill the space entirely with non-combustible insulation or provide sprinkler protection. Also the fire sprinkler riser needs to be relocated out of the access door way to the riser room.
BLD-Conference8/4/20108/5/20108/4/2010ACANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Framing/Rough-in8/4/20108/4/20108/4/2010APART
DetailsJim Sly
Inspection of roof sheeting Phone #: ###-#### >> Inspection requested via web by John McCarthy
Roof sheathing nailing OK.
BLD-Footing7/12/20107/12/20107/12/2010PPASS
DetailsJim Sly
John - Inspection for two footings added to existing pony wall footings - MTI is scheduled for 10:30 for epoxy rebar Phone #: ###-#### >> Inspection requested via web by John McCarthy OK Pending MTI approval.