BLD-Final | 7/21/2010 | 7/23/2010 | 7/23/2010 | P | PASS |
Dave Hannah
|
|
|
Please contact Brandon to schedule a time to meet at the site for the inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
FIRE-Final Inspection | 7/21/2010 | 7/23/2010 | 7/23/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. Project related fire alarm work has been finaled.
|
BLD-Final | 7/19/2010 | 7/20/2010 | 7/20/2010 | A | NR |
Dave Hannah
|
|
|
Please contact Brandon at the referenced phone number to set up time to meet for inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
BLD-Other | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Dave Hannah
|
|
|
Please contact Brandon McCurdy at ###-#### to set up a time for scheduled inpection. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover ceiling
|
BLD-Other | 4/26/2010 | 4/26/2010 | 4/26/2010 | P | PASS |
Dave Hannah
|
|
|
Request ceilin inspection in areas that construction occured. Please contact Brandon McCurdy @ ###-#### to set up a time to meet at the site. Thanks. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover ceiling grid
|
BLD-Framing/Rough-in | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Dave Hannah
|
|
|
Please contact Brandon McCurdy @ ###-#### about 1/2 hour prior to inspection. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover after elec rough in is completed
|