Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00368
StatusFinaled
Name VISTA CONSTRUCTION INC
Site Address 1002 S VISTA AVE
Project NameCERAMICA
Customer Number 
ePlanReviewNo
Description
(CERAMICA) The North wall of this tenant space is required to be a 2-hr fire wall. This building is fire sprinklered. To remodel an existing tenant space for a new retail sales pottery shop. Floor area from this tenant space and from an adjacent tenant space will be used to create a 241 square foot restroom core that will serve both tenant spaces. This tenant space will have a floor area of about 1,941 square feet. Work is to include interior nonbearing walls, interior doors, accessible high and low drinking fountains, and finishes. Both restrooms within the restroom core are required to be accessible to the disabled as defined by current standards. Work also includes completing a 2-hr fire wall. The fire wall is located at grid line 9 as defined by permit BLD04-02464. An existing 90 minute roll down fire door will be relocated and made operational to protect the opening under the covered walkway. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/7/20104/7/20104/7/2010APASS
DetailsForrest France
Correction notice item finished, fire life safety final approved.
BLD-Other4/7/20104/7/20104/7/2010ADONE
DetailsForrest France
On site functional testing of the relocated automatic fire door completed satisfactory and within allowable closure rates per NFPA 80.
BLD-Final4/7/20104/7/20104/7/2010APASS
DetailsJim Storey
final ok card not avalable to sign.
BLD-Other4/7/20104/7/20104/7/2010APASS
DetailsJim Storey
fire door actuation test.
BLD-Conference4/6/20104/6/20104/6/2010APASS
DetailsJim Storey
BLD-Conference4/5/20104/6/20104/6/2010PCANC
DetailsJim Storey
FIRE-Final Inspection3/26/20103/26/20103/26/2010APART
DetailsForrest France
ref. NFPA 80 regarding min. and max closure rate for the relocated fire door- (6"/sec. - 24"/sec.).
BLD-Final3/25/20103/25/20103/25/2010PPART
DetailsJim Storey
mike Phone #: ###-#### ti ok to occupnance work on fire shudder in progress. temp isued.
FIRE-Final Inspection3/24/20103/25/20103/25/2010APART
DetailsForrest France
Fire life safety inspection completed satisfactory, noted corrections finished within the tenant space. Final pending completion and testing of the relocated automatic fire door at the exterior canopy per scope of pemit work.
FIRE-Conference3/24/20103/24/20103/24/2010PDONE
DetailsForrest France
On site visit regarding fire life safety inspection items including exit signs, EM lights, door hardware, etc.
BLD-Conference3/24/20103/24/20103/24/2010APASS
DetailsJim Storey
door being relocated
BLD-Conference3/22/20103/22/20103/22/2010APASS
DetailsJim Storey
reviewed relocation of 2 hr fire shudder for compliant applacation to protect canopy opening.
BLD-Framing/Rough-in3/16/20103/17/20103/17/2010APASS
DetailsJim Storey
mike Phone #: ###-####