FIRE-Final Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | P | PASS |
Forrest France
|
|
|
Noted correction items field verified for completion, life safety passed.
|
BLD-Final | 4/30/2010 | 5/3/2010 | 5/3/2010 | A | PASS |
Jim Storey
|
|
|
final ok
|
BLD-Final | 4/30/2010 | 4/30/2010 | 4/30/2010 | A | DEFR |
Jim Storey
|
|
|
Darrin @###-#### per Jim Storey to monday am
|
FIRE-Final Inspection | 4/30/2010 | 4/30/2010 | 4/30/2010 | P | FAIL |
Forrest France
|
|
|
Hardware at several doors serving individual tanning rooms does not meet adopted code, missing plans on site, need permit status changed to "issued" prior to final- (currently "under review"), noted jobsite is not in condition for final at this time due to finishes in progress. Discussed issues with contractor- final to be scheduled Mon. 5/3 as agreed.
|
BLD-Framing/Rough-in | 3/12/2010 | 3/15/2010 | 3/15/2010 | A | PASS |
Jim Storey
|
|
|
darrin Phone #: ###-#### need reception counter to be added to plan to meet ada chapter 11 of the ibc
|
BLD-Framing/Rough-in | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | NR |
Jim Storey
|
|
|
darrin Phone #: ###-#### ele failled
|
BLD-Framing/Rough-in | 3/5/2010 | 3/8/2010 | 3/8/2010 | A | PART |
Jim Storey
|
|
|
Darren Phone #: ###-#### need ele aproval to cover ok to one side and do not cover ele for insp.
|