BLD-Final | 8/13/2010 | 8/16/2010 | 8/16/2010 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Final | 8/11/2010 | 8/12/2010 | 8/12/2010 | P | PART |
Jim Storey
|
|
|
Ryan Phone #: ###-#### tank handles/ signage.
|
FIRE-Final Inspection | 8/9/2010 | 8/10/2010 | 8/10/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory pending approved door hardware is installed at the two restrooms- to be corrected and verified by the structural inspector as agreed. Contractor to contact Boise Fire Dept. regarding an operational permit for the basement tanks.
|
BLD-Framing/Rough-in | 7/9/2010 | 7/9/2010 | 7/9/2010 | P | PASS |
Jim Storey
|
|
|
ceilling gyp sheer and gyp over can lights ok
|
BLD-Energy code compliance | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Jim Storey
|
|
|
need to check fblk at ceilling access for tpo of wall chase for return air duct.
|
BLD-Framing/Rough-in | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | CANC |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 7/1/2010 | 7/1/2010 | 7/1/2010 | P | PART |
Jim Storey
|
|
|
ryan Phone #: ###-#### gas line aproval fo test in wall/ protect non ic can lights/ fire blk chalk and seal.
|
BLD-Conference | 6/25/2010 | 6/25/2010 | 6/25/2010 | P | PART |
Jim Storey
|
|
|
review of ceilling diaphram detail requsting rfi as to aplacition.
|
BLD-Other | 6/7/2010 | 6/8/2010 | 6/8/2010 | P | PASS |
Jim Storey
|
|
|
bryan - suspended slab Phone #: ###-#### rebar ok si on line for am
|
BLD-Framing/Rough-in | 5/25/2010 | 5/26/2010 | 5/26/2010 | A | NR |
Jim Storey
|
|
|
Basement wall inspection please-Ryan Phone #: ###-#### cloned foudation insp pass/
|
BLD-Foundation | 5/26/2010 | 5/26/2010 | 5/26/2010 | A | PASS |
Jim Storey
|
|
|
Basement wall inspection please-Ryan Phone #: ###-#### rebar ok to cover.
|
BLD-Footing | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-#### strata si for am placement ok
|