Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-00550
StatusFinaled
Name RANDY HEMMER CONSTRUCTION LLC
Site Address 276 W BOBWHITE CT
Project NameBarbacoa Restaurant
Customer Number 
ePlanReviewNo
Description
Barbacoa Restaurant Rebuild and Addition - To rebuild an 8,170 square foot, one story, wood framed restaurant building that was destroyed by fire. The building is being reconstructed from the existing foundation up. There will also be a new 310 square foot main entry area addition on the west side of the building and a new 795 square foot addition along the south side of the building. The roof height will be increased approximately 8 feet above the original building roof height. The original approved plans are being modified to include a 400 square foot, mezzanine above the public restroom area and a 500 square foot dining area on the north east corner of the roof. The mezzanine is limited to 20 seats and the roof top dining is limited to 29 seats. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/19/20114/19/20114/19/2011PPASS
DetailsJim Storey
FIRE-Final Inspection4/18/20114/19/20114/19/2011APASS
DetailsForrest France
Corrections and adjustments completed. Fire life safety finaled.
BLD-Final4/14/20114/15/20114/19/2011ADEFR
DetailsJim Storey
FIRE-Final Inspection4/15/20114/15/20114/18/2011APART
DetailsForrest France
Reinspection scheduled 4/19 AM.
FIRE-Final Inspection4/13/20114/14/20114/14/2011AFAIL
DetailsForrest France
Construction and use of exterior canopies must comply with the requirements of NFPA 13 2007 8.15.7 (8.15.7.2 & 8.15.7.5). Remainder of final inspection issues completed acceptable. Rooftop EM light repaired while on site.
BLD-Final4/13/20114/14/20114/14/2011PCANC
DetailsJim Storey
todd Phone #: ###-####
BLD-Framing/Rough-in2/15/20112/15/20112/15/2011APASS
DetailsJim Storey
BLD-Framing/Rough-in2/11/20112/14/20112/14/2011APART
DetailsJim Storey
Bob or Sadie-Steel stud inspection Phone #: ###-#### clip welding nr atchment to studs pending.
BLD-Final12/29/201012/30/201012/30/2010APART
DetailsJim Storey
Todd Phone #: ###-#### ok for temp first floor only.
FIRE-Final Inspection12/29/201012/30/201012/30/2010APART
DetailsForrest France
Temporary Occupancy approved per conditions. See permit activity notes dated 12/7. Some aspects incomplete and not approved for occupancy at this time including rooftop dining, second level VIP room, exterior stairway. No storage allowed in attic spaces.
BLD-Conference12/27/201012/27/201012/27/2010PPASS
DetailsJim Storey
recieved stair engineering for planreview.
BLD-Foundation12/20/201012/20/201012/20/2010PPASS
DetailsJim Storey
Jay Phone #: ###-####
BLD-Footing12/17/201012/17/201012/17/2010PPASS
DetailsJim Storey
Todd Phone #: ###-####
BLD-Conference12/10/201012/10/201012/13/2010PCANC
DetailsJim Storey
todd Phone #: ###-####
BLD-Conference12/10/201012/13/201012/13/2010APART
DetailsJim Storey
Kitchen ok to be used for training.
BLD-Framing/Rough-in12/7/201012/8/201012/8/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### 2 nd floor ok to cover.
BLD-Framing/Rough-in12/6/201012/7/201012/7/2010APART
DetailsJim Storey
Todd Phone #: ###-#### box out lid penatrations/ok to insulate
BLD-Concrete12/3/201012/3/201012/3/2010PPART
DetailsJim Storey
Todd Phone #: ###-#### reviewed rated walls ok to continue assemblie. ft for outside stair from roof ok to form up pending submital if change is decieded.
BLD-Conference11/1/201011/1/201011/1/2010PPART
DetailsJim Storey
call when go out//Todd ###-####
BLD-Framing/Rough-in9/3/20109/7/20109/7/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### orignial approval plan and pending resumital aprovals.
BLD-Energy code compliance9/7/20109/7/20109/7/2010APASS
DetailsJim Storey
Todd Phone #: ###-####
FIRE-Conference9/3/20109/3/20109/3/2010PDONE
DetailsForrest France
Discussion regarding project related fire alarm and sprinkler permit work.
BLD-Framing/Rough-in9/2/20109/3/20109/3/2010PPART
DetailsJim Storey
Todd Phone #: ###-####
BLD-Energy code compliance8/27/20108/27/20108/27/2010PPART
DetailsJim Storey
Todd Phone #: ###-#### air seal ok
FIRE-Conference8/4/20108/5/20108/5/2010ADONE
DetailsForrest France
On site conference regarding project related fire alarm work, HVAC duct detectors, light fixture obstructions at the womens restroom, door hardware, fire code review notes, type one hood suppression, seismic clearance at the new UG fire sprinkler supply, project schedule, etc.
BLD-Conference7/19/20107/20/20107/20/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### sheer exterior ok to cover/ interior ele room ok to gyp.
BLD-Other7/13/20107/13/20107/13/2010PPASS
DetailsJim Storey
Todd Phone #: ###-#### paripets filled with blow in insulation full to comply with type of const. to not have to sprinkler the areas.
BLD-Conference7/12/20107/13/20107/13/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### roof deck insulated to 6 inches to meet ec report not 4 per drawring. ok
FIRE-Conference7/12/20107/13/20107/13/2010ADONE
DetailsForrest France
Regarding insulation fill at concealed spaces.
BLD-Other7/7/20107/8/20107/8/2010PPASS
DetailsJim Storey
nail inspection//Todd Martin Phone #: ###-#### roof nailling ok per plan.