BLD-Final | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Jim Sly
|
|
|
debbie Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 6/23/2010 | 6/28/2010 | 6/28/2010 | A | PASS |
Troy Cobbley
|
|
|
The thumb turn lock that has been installed on the main entry/exit has been defurred to the building inspector. I notified debbie, at the vision office, of what needs to be done. I also notified Jim Sly about this follow up.
|
FIRE-Final Inspection | 6/22/2010 | 6/23/2010 | 6/23/2010 | P | FAIL |
Forrest France
|
|
|
The main entry/exit door is equipped with a manual thumbturn. See plan review notes for details pertaining.
|
FIRE-Final Inspection | 5/25/2010 | 5/25/2010 | 5/25/2010 | P | FAIL |
Troy Cobbley
|
|
|
The door hardware on both of the exit doors had been changed to thumbturns. I went over acceptable hardware with Debbie.
|
BLD-Final | 5/14/2010 | 5/17/2010 | 5/17/2010 | P | NR |
Jim Sly
|
|
|
richard Phone #: ###-#### Need Fire Final
|
FIRE-Final Inspection | 5/14/2010 | 5/17/2010 | 5/17/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware and remove the thumbturn deadbolt on the north exit door and mount the fire extinguisher. I spoke with the owner about doors that are swinging the wrong way as marked in red on the plans.
|
BLD-Final | 5/13/2010 | 5/14/2010 | 5/14/2010 | P | NR |
Jim Sly
|
|
|
Kurt Phone #: ###-#### Need Fire final.
|
BLD-Conference | 4/21/2010 | 4/22/2010 | 4/22/2010 | A | DONE |
Jim Sly
|
|
|
Kurt Olson Phone #: ###-####
|