Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-00902
StatusFinaled
Name VERTICAL CORP
Site Address 314 S 6TH ST
Project NameFront 5 West Building
Customer Number 
ePlanReviewNo
Description
(*SHELL & CORE* - Front 5 West Building) Permit is to remodel an existing 8,417 square foot area left behind from BLD10-00174. Approval contingent upon adhering to the approved plans on file, attached engineering, and DRH10-00075. Work to include: construction of interior non-bearing walls to create a new 1,362 square foot tenant space (BLD10-00995), construction of new accessible entrance ramp, installation of new store front systems in in-filled openings, construction of retaining walls where future egress stair is to be located, relocate existing drainage swell, construction of new entrance canopy over new entry, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/16/201012/16/201012/16/2010APASS
DetailsDave Hannah
BLD-Aging Inspection12/13/201012/13/201012/16/2010 PASS
DetailsDave Hannah
BLD-Final10/11/201010/12/201010/12/2010APASS
DetailsDave Hannah
jerry Phone #: ###-####
FIRE-Final Inspection10/11/201010/11/201010/11/2010PPASS
DetailsTroy Cobbley
life safety passed
BLD-Aging Inspection10/1/201010/1/201010/5/2010 PASS
DetailsDave Hannah
BLD-Framing/Rough-in7/12/20107/12/20107/13/2010PPASS
DetailsDave Hannah
JERRY Phone #: ###-#### 1hr ceiling framing in corrador
FIRE-Conference7/7/20107/7/20107/7/2010PDONE
DetailsForrest France
On site visit with contractor regarding permit work in progress, shell and tenant occupancy request finals.
BLD-Framing/Rough-in6/21/20106/21/20106/21/2010PPART
DetailsDave Hannah
Jerry Phone #: ###-#### ok to cover walls back half
BLD-Conference6/16/20106/17/20106/17/2010APASS
DetailsDave Hannah
Jerry ###-#### talked about 1hr lid in corridor
BLD-Conference6/16/20106/16/20106/16/2010PDEFR
DetailsJim Storey
Jerry ###-#### to dave am
FIRE-Conference6/9/20106/9/20106/9/2010PDONE
DetailsTroy Cobbley
Jerry wanted to verify that a fire alarm system was not required for the Addecco T.I. space. Per Scott and Stephanie it appears that an alarm system is not required. The adjoining space appears to have a non required detection system for a FM200 suppresson system which has been submitted to have devices removed under a separate permit.
BLD-Framing/Rough-in6/3/20106/4/20106/4/2010APASS
DetailsJim Storey
Jerry Phone #: ###-#### grid a-c 1-3 ti area.
BLD-Foundation5/18/20105/19/20105/19/2010APASS
DetailsDave Hannah
Re-bar inspection for stem walls please-Jerry Phone #: ###-####