Permit Information
Permit NumberBLD10-00924
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1015 N 8TH ST
Project NameChildren School of Boise
Customer Number 
ePlanReviewNo
Description
Children's School of Boise - Remodel - To demo and remove all floor finishes, ceilings, and most interior partitions, leaving the two interior stairways, restroom #114 and a portion of the south library partition wall. To demo, remove and replace most of the existing piping, wiring and mechanical equipment and ductwork. To remodel the entire 3,540 square foot first floor, including furring the interior side of the exterior CMU walls to increase insulation values, to windows throughout and install new roof insulation and single-ply membrane roofing. The remodel include new classroom, restroom, library and office layout. This permit will also include the complete remodel of the 655 square foot basement to include two new accessible restrooms, a furnace room and laundry/breakroom area. All sidewalks, parking lot, trash enclosure, power upgrades, water and sewer lines for the new restroom off of the playground will be completed as part of this permit. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/3/20112/4/20112/4/2011APASS
DetailsTony Young
Brett-Please call in there are any issues--Let Barb know if Perm Occ can be issued at ###-#### Phone #: ###-####,,
ok for perm occ on this permit
BLD-Final9/17/20109/20/20109/20/2010ANR
DetailsMike Jordan
julian Phone #: ###-####. Needs to install glazing in doors, Also noted issue with adition on plans. Will wait for Tony to give final sign off.
FIRE-Final Inspection9/15/20109/15/20109/15/2010APASS
DetailsForrest France
Fire life safety okayed.
FIRE-Final Inspection9/14/20109/14/20109/14/2010PPASS
DetailsForrest France
Corrections finished, fire life safety final approved.
BLD-Final9/13/20109/14/20109/14/2010APART
DetailsTony Young
Jullion Phone #: ###-####,, TEMP. OCCUPANCY ONLY,, pending others
BLD-Final9/10/20109/13/20109/13/2010PPART
DetailsTony Young
Jullion Phone #: ###-####,, walk through only,, punch list with Jullion
FIRE-Final Inspection9/10/20109/13/20109/13/2010PFAIL
DetailsForrest France
Provide panic hardware at three locations, post signage at the door to the FACP room, post one fire extinguisher at the basement mechanical room per review notes, remove one non-functional SD at the west stairway, provide approved plan mod reflecting the scope of work not including the new addition incomplete at this time. Project finishes underway.
FIRE-Conference9/9/20109/10/20109/10/2010ADONE
DetailsForrest France
On site conference with contractor regarding fire life safety items including door hardware, exit signs/EM lights, review notes, project related fire alarm work, etc. Missing city approved plan set on site.
BLD-Framing/Rough-in9/7/20109/8/20109/8/2010APASS
DetailsTony Young
Julian-Ceiling grid inspection please Phone #: ###-####
BLD-Framing/Rough-in8/12/20108/13/20108/13/2010APART
DetailsTony Young
Jullion Phone #: ###-####,, ok to cover walls,, need to get ok from architect or engineer on point load in north west corner that lands in the middle of basement class room
BLD-Conference8/6/20108/9/20108/12/2010APASS
DetailsTony Young
jullian Phone #: ###-####,, basement ceiling,, 2 hr..
BLD-Conference8/6/20108/6/20108/6/2010PPART
DetailsTony Young
jullian Phone #: ###-####,, frame walk through,, and inspected north portion in basement 2 hour ceiling,, 1st, 2nd,3rd layers,, ok so far