Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-00960
StatusFinaled
Name PACIFIC SIERRA CONSTRUCTION
Site Address 805 W IDAHO ST 200
Project NameBOISE CITY NATL BANK BLDG
Customer Number 
ePlanReviewNo
Description
(The Caprock Group) - The fire sprinkler system substitutes for the 1-hr fire-resistance-rating of the building structure. To remodel an existing 4,000 square foot, office tenant space, on the second floor, of an existing building. Work to include: minor demolition per plans; construct new 2X4, wood, interior non-bearing, partition walls to create a storage room and an open office area; construct a partial height wall for an entry feature; related interior finishes in compliance with chapter 8 of the 2006 IBC; repair and replace existing ceiling system as required; upgrade the lighting layout; modify the existing exit lighting; plumbing, mechanical, and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/22/201112/23/201112/29/2011APASS
DetailsDave Hannah
Per Dave Hannah give Occupancy
BLD-Aging Inspection3/8/20113/8/20113/8/2011 PASS
DetailsDave Hannah
BLD-Conference1/6/20111/6/20111/6/2011APASS
DetailsDave Hannah
BLD-Aging Inspection1/6/20111/6/20111/6/2011 PASS
DetailsDave Hannah
BLD-Conference10/14/201010/14/201010/19/2010PPASS
DetailsDave Hannah
BLD-Final8/6/20108/6/20108/7/2010PPART
DetailsDave Hannah
scott Phone #: ###-#### ok for temp occ
FIRE-Final Inspection8/6/20108/6/20108/6/2010PPASS
DetailsForrest France
Fire life safety inspection completed acceptable.
FIRE-Final Inspection8/3/20108/4/20108/5/2010PNR
DetailsForrest France
Pending project related FIR permit completions. Noted missing "door to remain....." signage at the tenant main entry/exit door during walkthrough- notified contractor to post prior to final.
BLD-Final8/5/20108/5/20108/5/2010PNR
DetailsDave Hannah
BLD-Final8/4/20108/5/20108/5/2010ANR
DetailsDave Hannah
Scott Phone #: ###-####
BLD-Other7/15/20107/19/20107/20/2010PPART
DetailsDave Hannah
Scott - ceiling Phone #: ###-#### 2nd floor ok
FIRE-Conference7/13/20107/13/20107/13/2010PDONE
DetailsForrest France
Regarding project related fire sprinkler permit work.
BLD-Framing/Rough-in6/17/20106/17/20106/17/2010PPASS
DetailsDave Hannah
Scott Phone #: ###-####