BLD-Final | 1/18/2011 | 1/18/2011 | 1/18/2011 | P | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####Ok for perm. occ.
|
BLD-Final | 12/6/2010 | 12/7/2010 | 12/7/2010 | P | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. Ok for temp. occ. Need final letter from special inspection agency.
|
FIRE-Final Inspection | 12/6/2010 | 12/7/2010 | 12/7/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 12/3/2010 | 12/6/2010 | 12/6/2010 | P | NR |
Mike Jordan
|
|
|
Andy Phone #: ###-####. Life/safety failed.
|
FIRE-Final Inspection | 12/3/2010 | 12/6/2010 | 12/6/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide indicator at the keyed hardware on the main exit door, repire the inactive leaf locking hardware on the double doors to the service bay and provide "No parking fire lane " signs as discussed.
|
BLD-Framing/Rough-in | 11/18/2010 | 11/19/2010 | 11/19/2010 | A | PASS |
Mike Jordan
|
|
|
ANDY Phone #: ###-####. Ceiling grid ok.
|
BLD-Energy code compliance | 9/21/2010 | 9/22/2010 | 9/22/2010 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####. Interior steel stud framed walls only.
|
BLD-Framing/Rough-in | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PART |
Mike Jordan
|
|
|
Andy Phone #: ###-####. Exterior curtain walls only, pending electrical rough in inspection.
|
BLD-Concrete | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PART |
Mike Jordan
|
|
|
Andy-pouring at 7:00am Phone #: ###-####. Concrete placement in progress for slab on grade. All reinforcement inspected by MTI.
|
BLD-Foundation | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 7/23/2010 | 7/26/2010 | 7/26/2010 | P | PART |
Jim Sly
|
|
|
BOB Phone #: ###-#### OK pending MTI special inspection, tests and approvals.
|
BLD-Foundation | 7/21/2010 | 7/22/2010 | 7/22/2010 | P | PASS |
Mike Jordan
|
|
|
bob - mud at 2:00 Phone #: ###-####. West stemwall, interior and perimeter column pedestals.
|
BLD-Footing | 7/20/2010 | 7/21/2010 | 7/21/2010 | P | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####. Interior comlumn pad footings, perimeter column pad footings and west footing. Noted project will have special inspection.
|